14
LIGHT TOWER SET UP
1. For maximum light coverage, locate the unit at ground level or in a spot higher than the area being illuminated
by the lamps.
WARNING
The mast extends up to 25 ft (7.6 m). Make sure area above the unit is open and clear
of overhead wires and obstructions.
2. Place the unit on firm ground that is relatively flat, then block the wheels to keep it from moving (A). This will
make it easier to level the unit.
3. Pull the locking pin on the tongue jack and rotate the jack 90°. Replace the locking pin (B). Turn the jack handle
clockwise to raise the trailer tongue off of the towing vehicle.
4. Connect a good earthen ground to the grounding stud on the frame of the trailer near the trailer tongue (C).
Note:
Consult local codes for proper grounding requirements.
5. Pull the locking pin (D) on the outrigger (E) and pull each outrigger out until the spring loaded locking pin snaps
back into place. Pull the locking pin on the outrigger jack and rotate each 90° so the jack pad is facing down and
the spring loaded pin snaps back into place.
6. Pull the locking pin on the rear jack (F) and rotate the jack 90° until the spring loaded pin snaps back into place.
Turn the jack handle clockwise to start leveling the trailer. Adjust all four jacks by turning their handles clockwise
until they are firmly in contact with the ground and the trailer is as level as possible (G).
7. Before raising the mast, it may be necessary to adjust the lamps. The lamps may be adjusted up, down, left or
right by loosening the wing nuts on the trunnion (H) and aiming them in the desired direction. Tighten the hardware
completely and make sure the lamps are connected to the junction box (J).
DETAIL C
DETAIL D
DETAIL G
DETAIL H
D
C
E
H
A
B
D
J
F
G
00156
Содержание MLT4060KV
Страница 39: ......
Страница 40: ...REV C PART NO 33298 01 10 14 ...