41
mTripod
Installation and assembly
7.7
Aligning the pedestrian gate
When installing several pedestrian gates, align the pedestrian gates to the
customer's specifications and to the on-site conditions, e.g. walls, tile joints
and railings, using a laser or scale.
7.8
Assembly of the mTripod
7.8.1
Mounting variant “Direct mounting”
With this mounting variant, you mount the turnstile directly on a foundation.
For the variant mTripod FMTP-ML you need 8 foundation anchors. For the
variant mTripod FMTP-MS you need 6 foundation anchors.
Required material (attachments):
›
Attachment set BSS100 for mounting the turnstile directly on a foundation
Prerequisites
›
The foundation was built.
›
The empty conduits were laid.
›
The foundation has cured.
Содержание MHTM FlowMotion mTripod
Страница 6: ...6 mTripod...
Страница 78: ...78 mTripod...
Страница 81: ...81 mTripod...
Страница 82: ...82 mTripod...
Страница 83: ...83 mTripod...