Full Height Turnstile MPT-132
Assembly and installation
25
5.3.1 Foundation
plan
1800
1424
407
50
120
60
1238
1500
Mag00435
407
120
60
F
F
F
F
F
F
50
F
5
3
2
1
1
2
4
Fig. 4: Foundation plan
1 Passage
direction
2 Empty
conduits
3 Bearing
4 Drilling
jig
5
Foundation anchor (F) with M10 internal thread, 16 mm bore hole,
drilling depth: 90 mm
Have cables overlapping for approx. 5 m of the conduits
Composite anchors M10
Bore hole diameter 16 mm, drilling depth 90 mm
Conduit for mains cable and data line
Foundation level and horizontal
Concrete or adequately integrated industrial flooring
With flagging, ensure that the anchor bolts grip firmly into the
foundation, use longer bolts if necessary.