Barrier MHTM
TM
MicroDrive
Start-up and operation
152
5815,5001US / Version 02.66
11.2 Commissioning
Check before
to initial start-up
The following inspections must be performed prior to initial start-up:
Check electrical connections.
Check barrier arm position.
Check balancing springs in the lever system and adjust if
required.
Inspection during the
first start-up
The following inspections must be performed prior to first start-up:
Check program mode.
See page 112, chapter 10.7.
Check parameterisation in connection with wiring.
Testing and setting the operating frequency of the induction
loops.
See page 144, chapter 10.15.1.
Check the function of the barrier, induction loops, safety light
barriers and the signalling devices.
11.3 Switching on and off the barrier
NOTICE!
NOTICE!
A too early mains voltage power up after a shut
down can result in damage of the equipment!
Therefore:
– Wait for at least 10 seconds after shutting off
the mains voltage before you switch the mains
voltage on again.
Fig. 53: Switching on and off the barrier
1
Service socket (WARNING: Service socket is live, also when mains
switch is switched off.)
2
Double pole mains switch
Содержание MHTM MicroDrive
Страница 1: ...Operating Instructions Barrier MHTMTM MicroDrive Doc ID 5815 5001US Version 02 6...
Страница 4: ...Barrier MHTM TM MicroDrive 4 5815 5001US Version 02 66...
Страница 10: ...Barrier MHTM TM MicroDrive 10 5815 5001US Version 02 66...
Страница 178: ...Barrier MHTM TM MicroDrive 178 5815 5001US Version 02 66...
Страница 179: ......
Страница 180: ...Barrier MHTM TM MicroDrive 180 5815 5001US Version 02 66...
Страница 182: ...Barrier MHTM TM MicroDrive Appendix 182 5815 5001US Version 02 66...
Страница 184: ......
Страница 186: ......
Страница 188: ......
Страница 195: ...Barrier MHTM TM MicroDrive 5815 5001US Version 02 6 195...