Installation
Check-out and Power-up
66
MagneMotion
Rockwell Automation Publication MMI-UM002E-EN-P - March 2016
Check-out and Power-up
System Check-out
Before the MagneMover LITE transport system is started for the first time, or after servicing
the transport system, it is necessary to check all operating and safety features.
The following start-up procedure is used to apply power to the MagneMover LITE transport
system in an orderly manner to ensure all components are in known conditions. This proce-
dure is used to prepare the transport system for full operation.
Mechanical Checks
•
Verify all shipping brackets have been removed.
•
Ensure that all MagneMover LITE components are properly and securely installed in
the facility.
•
Ensure that all hardware is secure.
•
If the optional E-Stop circuit is being used, ensure that the button is functional.
•
Manually move a vehicle (puck) through the entire MM LITE transport system to
ensure free motion (no binding).
Facility Checks
•
Ensure that all facilities are capable of meeting, or exceeding, the requirements as
described in the
•
Ensure that the power and communications connections have been completed.
•
Check all cables. Verify the connectors are fully seated and screws/locks are secured to
ensure good continuity.
•
Verify all cables are routed in a safe place and away from any travel areas.
•
Inspect all cables for restricting bend radii, excessive tension, or physical damage.
Pre-operation Checks
•
Ensure that there are no obstructions in the travel path of the vehicles (pucks).
Содержание MagneMover LITE
Страница 1: ...MagneMover LITE User Manual ...
Страница 284: ...Operation 28 MagneMotion Rockwell Automation Publication MMI UM002E EN P March 2016 This page intentionally left blank ...
Страница 381: ...MagneMover LITE User Manual 501 Rockwell Automation Publication MMI UM002E EN P March 2016 Notes ...