magicpak HWC8 V Series Скачать руководство пользователя страница 12

Page 12 of 19

507388-03

Issue 2110

Operation

Operation of the unit is automatic and will provide heating 

and cooling depending on the setting of the thermostat.

Heating

1.  Turn on main power supply.
2. 

Open manual gas shutoff valve.

3.  Set thermostat system to “HEAT”.
4.  Set thermostat to temperature desired.

Cooling

1.  Turn on main power supply.

2.  Set thermostat system switch to “COOL”.
3.  Set thermostat to temperature desired.

Heating Sequence of Operation

1.  Thermostat calls for heat.

2. 

Combustion blower starts and proper air flow is proven 

by the pressure switch closing.

3.  Blower continues to operate for 30 seconds prior to 

the burners lighting.

4.  Ignition control begins spark and opens gas valve. The 

burners  are  lit.  Ignition  is  proved  through  the  flame 

sensor.

5.  Circulating air blower starts 30 seconds after the 

burners light.

6. 

When  the  thermostat  is  satisfied,  the  burners  and 

combustion blower shut off.

7. 

Circulating air blower will shut off 120 seconds later.

If the burners should fail to ignite, the ignition control will 

try to ignite the burners a total of three times. Should the 

burners fail to ignite within the three trials for ignition, the 

ignition control will lock out for 1 hour before beginning 

another ignition cycle. To reset the control, turn the 

thermostat  down  or  off  for  10  seconds  and  then  set  to 

desired setting. At this time, the ignition sequence will try 

again.

Blower Control

The blower will start approximately 30 seconds after the 

burners ignite and will stop approximately 120 seconds 

after the thermostat is satisfied. The time delay is preset at 

the factory and timing can not be adjusted.

Cooling Sequence of Operation

When the thermostat system switch is set for “COOL”, the 

blower will start 5 seconds after the thermostat calls for 

cooling and will stop 90 seconds after the thermostat is 

satisfied.

Continuous Fan Operation

Continuous operation of the air handling blower will be 

obtained if the thermostat fan switch is set to “ON”. With 

the thermostat fan switch set to “AUTO”, the air handling 

blower will cycle corresponding with the thermostat cycling.

To Shut Down Unit

For temporary or short periods of shutdown, set the 

thermostat system switch to “OFF”. For a prolonged period 

of shutdown, set the thermostat system switch to “OFF” 

and turn off the electrical power supply and the gas supply 

to the unit.

Содержание HWC8 V Series

Страница 1: ...ombustible materials near the furnace or warm air ducts The material may ignite by spontaneous combustion creating a fire hazard WARNING These units are not approved for mobile home applications Such...

Страница 2: ...03 Issue 2110 22 27 7 8 29 7 16 13 3 8 43 3 16 16 1 6 1 8 1 Supply Return Low Voltage Supply Line Voltage Box 1 3 4 8 2 3 4 1 1 2 2 7 8 18 1 4 2 2 1 2 Gas Inlet Condensate Drain HWC9 Only Return Supp...

Страница 3: ...tile or other combustible material other than wood flooring The grille side of the unit may be flush with or extend beyond the face of the exterior wall but should not be recessed more than 2 from the...

Страница 4: ...When properly nested the angle on top of the unit should line up with the top flange of the sleeve and should almost touch Fasten the unit to the sleeve with five screws furnished with the sleeve The...

Страница 5: ...could cause an unsafe condition 3 Insofar as is practical close all building doors and windows between the space in which the appliances remaining connected to the common venting system are located an...

Страница 6: ...losing the individual manual shutoff valve during any pressure testing of gas supply piping system at test pressures equal to or less than 1 2 psig or 14 W C If the piping system is to be tested at pr...

Страница 7: ...the unit Refer to the rating plate located on the unit for proper fuse or breaker size Make sure the unit is electrically grounded in accordance with local codes or in the absence of local codes with...

Страница 8: ...in the return duct work or elsewhere the permanent filter can be used or replaced with a disposable filter If a disposable filter is used refer to the information provided in Table 1 when sizing the...

Страница 9: ...e checked to see that none of the wiring is loose or missing Cooling chassis is charged with R410A refrigerant Blower The unit contains a direct drive multispeed blower The proper speeds have been pre...

Страница 10: ...6012P18A 45 75 60 TAP 1 HEAT 208 or 230 630 71 600 N A 570 N A 550 N A TAP 2 HEAT 208 or 230 770 58 740 60 715 62 690 64 TAP 3 HEAT 208 or 230 885 50 855 52 830 54 810 55 TAP 4 COOL 208 or 230 560 540...

Страница 11: ...ustment Screw Under Cap Gas Manifold Pressure Test Tap Model Rise Range F Mid Rise F Indoor Blower Speed Unit Voltage V 0 1 w c 0 2 w c 0 3 w c 0 4 w c SCFM Temp Rise F SCFM Temp Rise F SCFM Temp Rise...

Страница 12: ...ee times Should the burners fail to ignite within the three trials for ignition the ignition control will lock out for 1 hour before beginning another ignition cycle To reset the control turn the ther...

Страница 13: ...osen these screws to remove control board mounting bracket Ignition Control Board Remove these screws to remove Burner Assembly Igniter Combustion Inducer Gas Valve Primary Limit Mounted to Vest panel...

Страница 14: ...Verify proper operation after servicing WARNING Refer to Figure 8 for heating compartment component layout It is recommended that the furnace be inspected annually by a qualified service person Burner...

Страница 15: ...ew and pull the igniter out of the burner assembly 4 For reassembly follow the above steps in reverse order Rollout Switch If for any reason the heat exchanger becomes blocked the temperature sensitiv...

Страница 16: ...from the flue collector box end 6 Brush out the inside of the flue collector box 7 Brush out the inside of the flue tube extension 8 If soot buildup is excessive clean the combustion inducer wheel an...

Страница 17: ...507388 03 Issue 2110 Page 17 of 19 Figure 10 Wiring Diagram HWC 12 18 Wiring Diagrams...

Страница 18: ...Page 18 of 19 507388 03 Issue 2110 Figure 11 Wiring Diagram HWC 24...

Страница 19: ...507388 03 Issue 2110 Page 19 of 19 Figure 12 Wiring Diagram HWC 30...

Отзывы: