OPERATION
HEATER/VENTILATION/AIR CONDITIONER
Operating manual T225 / T230
47
Heater/Ventilation/Air Conditioner
Controls
Fig. 27: Controls
1
Temperature rotary switch
2
“Air conditioner” on/off switch – optional
3
Blower switch (4-stage)
The controls for the heater, ventilation and the air conditioner
(optional) are installed between the footwell and the central
electric box.
Fig. 28: Operation
1
Heater “completely off”
2
Heating “on full”
3
Blower “off”
4
Maximum blower output
5
“Air conditioner” switch – optional
Set amount of ventilation
The amount of ventilation can be set to five speeds with
the blower switch.
X
Turn the blower switch to the right
4
.
Speed “4” = maximum blower output
X
Turn the blower switch to the left
3
.
Speed “0” = blower off
Air conditioner – optional
X
Press the switch
5
.
3
The air conditioner is switched on.
3
The green LED is lit.
X
Press the switch
5
.
3
The air conditioner is switched off.
3
The green LED goes out.
11-C26-067-033A-2
1
2
3
4
5
11-C26-067-034A-1
Содержание Trac T225
Страница 1: ...Operating manual MAFI Trac T225 T230 Terminal Trac get it rolling Production no 3260028 3260035...
Страница 5: ...Operating manual T225 T230 3 VEHICLE IDENTIFICATION Vehicle identification plate Production number...
Страница 8: ...6 Operating manual T225 T230...
Страница 16: ...14 Operating manual T225 230...
Страница 28: ...SAFETY WARNING SIGNS ON THE MAFI TRAC 26 Operating manual T225 230...
Страница 29: ...Operating manual T225 T230 27 YOUR MAFI TRAC Product description Exterior view Interior view...
Страница 34: ...32 Operating manual T225 T230...
Страница 118: ...OPERATION MAINTENANCE 116 Operating manual T225 230...
Страница 119: ...Operating manual T225 T230 117 TRANSPORT Loading onto a flatbed trailer Loading with a crane...
Страница 142: ...TECHNICAL DATA BRAKE SYSTEM 140 Operating manual T225 T230...