995051 – Revision A
Page 33 of 36
Step 6 - Place the Base Assembly on its side for easier service – Gently rest the Base
Assembly on its side to avoid damage such as paint scratching.
Step 7 - Remove the Leg Rod Assembly. (Refer to section 9.8)
Step 8 – Remove the LH Leg and the RH Leg from the Base. (Refer to section 9.11) – The
Castors are not required to be removed.
Refitting / Replacement
Step 9 - Refitting is a reversal of the removal process noting the following point:
A)
Ensure the Star Knob is fully tightened to disallow any play between the Mast and Base
of the Hoist.
9.13 – Boom
Within this section it will explain the correct procedure on removing and reinstalling the Boom for
servicing procedures or replacement.
Removal
Step 1 – Remove the Lift Actuator Cable. (See section 9.2.2)
Step 2 – Remove the Lift Actuator. (See section 9.5)
Step 3 – Remove the Carry Bar. (See section 9.7)
Step 4 - Remove the two Black Caps from the Boom fixing points.
Step 5 – Using two 17mm Spanners, remove a nut and washer from the Boom Pin as shown.