background image

17 | 

P a g e

 

 

 

 

 

 
Tests: 
 
Operational test: 

 
1. 

Supply power to the Screena machine. 

 
2. 

Press Start button on control box 

 
3. 

Screena should start vibrating 

 
4. 

Press Stop button on control box 

 
5. 

Screena should stop vibrating 

 
 

Set-up / Mesh exchange: 
 

1. 

Select an area that is firm, level and free of obstruction. 

 
2. 

To attach screen mesh, loosen tensioner bolts at top of machine. 

 
3. 

Lay new mesh onto tensioner bars 

 
4. 

Tension until tight 

 
5. 

Press Start button on control box 

 
6. 

If mesh rattles: Stop Screena and re-tighten tensioner bolts evenly. 

 
7. 

Repeat as necessary until rattle stops 

 
 
 
 

If the machine fails any of these function tests, it should be 

removed from service and repaired. 

 

Содержание Screena

Страница 1: ...1 P a g e Operators manual Screena MANUFACTURERS ORIGINAL INSTRUCTIONS MCE SCREENA 21 A1 2...

Страница 2: ...d Machine Hazard 7 LEGEND 8 PRE OPERATION INSPECTION 9 Fundamentals 10 MAINTENANCE 12 Observe and Obey 12 Maintenance symbols legend 12 Check mesh tension 13 Check all fasteners for tightness 14 Sched...

Страница 3: ...tted to operate this machine This manual should be considered a permanent part of your machine and should remain with the machine at all times If you have any questions please call Mace Industries Con...

Страница 4: ...ituations Know and understand the safety rules before going on to the next section 2 Always perform a pre operation inspection 3 Always perform function tests prior to use 4 Inspect the workplace 5 On...

Страница 5: ...ne as a ground for welding Ensure safe routing of power cable to minimise risk of electrocution Keep away from the machine if it contacts energized power lines Personnel must not operate or move the m...

Страница 6: ...ecification Be aware of ground surface prior to installation Do not place ladders or scaffolding against any part of this machine Do not use the machine on a moving or mobile surface or vehicle Ensure...

Страница 7: ...load Damaged Machine Hazard Do not use a damaged or malfunctioning machine Conduct a thorough pre operation inspection of the machine and test all functions before each work shift Immediately tag and...

Страница 8: ...ls 13 Foot Pin 2 Control Box 8 Vibratory Oscillating Mounts 14 Pivoting Foot 3 Power In Connector 9 Machine Handles 4 Power Out Connectors 10 Adjustable Feet 5 Start Button 11 Mesh Tensioner 6 Stop Bu...

Страница 9: ...contained in this operator s manual 1 Avoid hazardous situations 2 Always perform a pre operation inspection Know and understand the pre operation inspection before going on to the next section 3 Alwa...

Страница 10: ...al may be performed by the operator Refer to the list on the next page and check each of the items and locations for modifications damage or loose or missing parts A damaged or modified machine must n...

Страница 11: ...rts o Emergency stop button o Control box o Wiring o Motor and cables o Tyres and wheels o Nuts bolts and other fasteners Check entire machine for o Cracks in welds or structural components o Dents or...

Страница 12: ...g to the manufacturer s specifications and the requirements specified in the responsibility s manual Maintenance symbols legend The following symbols have been used in this manual to help communicate...

Страница 13: ...the machine with an improper mesh tension can damage machine components Check mesh tension whilst power is off 1 When machine is turned off ensure the mesh is fitted correctly 2 Turn the Screena on If...

Страница 14: ...tioning properly 3 Complete this process throughout the machine __________________________________________________________________________ Scheduled Maintenance Maintenance performed quarterly and ann...

Страница 15: ...in this operator s manual 1 Avoid hazardous situations 2 Always perform function tests prior to operation Know and understand the function tests before going on to the next section 3 Always perform fu...

Страница 16: ...nctions A malfunctioning machine must never be used If malfunctions are discovered the machine must be tagged and removed from service Repairs to the machine may only be made by a qualified service te...

Страница 17: ...ge 1 Select an area that is firm level and free of obstruction 2 To attach screen mesh loosen tensioner bolts at top of machine 3 Lay new mesh onto tensioner bars 4 Tension until tight 5 Press Start b...

Страница 18: ...this operator s manual 1 Avoid hazardous situations 2 Always perform function tests prior to operation 3 Always perform function tests prior to use 4 Inspect the workplace Know and understand the func...

Страница 19: ...the workplace hazards then watch for and avoid them while moving setting up and operating the machine Workplace Inspection Be aware of and avoid the following hazardous situations Bumps floor obstruc...

Страница 20: ...safe machine operation contained in this operator s manual 1 Avoid hazardous situations 2 Always perform function tests prior to operation 3 Always perform function tests prior to use 4 Inspect the w...

Страница 21: ...must be loaded responsibly and with skill by the operator as to not cause damage by overloading the unit Only trained and authorized personnel should be permitted to operate a machine If more than on...

Страница 22: ...ials from under the mesh This can easily be done with a Shifta conveyor placed under the unit If a conveyor is not available a wheelbarrow will suffice After the Screena is set up and the removal of m...

Страница 23: ...on the mesh too long increase the angle of the screening by extending the legs at the rear of the unit This will increase the spill speed Not long enough decrease the angle of the screening by lowerin...

Страница 24: ...be parked on a level surface Use chocks on the wheels whilst being transported Securing to Truck or Trailer for Transit Always check the machine wheel brakes are on in preparation for transport Inspe...

Страница 25: ...um payload 250kg Machine self weight 180kg Motor frequency 50hz Electric motor power 0 55kw Storage dimensions 1 95m x 1 65m x 1 2m Noise emissions A weighted 75dB Supply Voltage 110v 240v see data pl...