2.6
Removing Hand Rails and Exhaust Stack
1.
Cut the plastic cable ties and move the hose bundle
clear of the platform.
Figure 2.25: Hand Rails and Exhaust Stack
Shipping Assembly
2.
Remove shipping wire and foam from the exhaust
stack (A).
3.
Remove nuts (B) from clamp (C), and remove the
exhaust stack (A) and clamp from the shipping frame.
4.
Reinstall nuts (B) onto clamp (C) and set exhaust
stack (A) aside for later installation.
5.
Remove the two bolts (D) securing the hand rail (E) to
the shipping frame, and remove the hand rail.
6.
Repeat for the other hand rail on the opposite side.
Retain hardware.
7.
Set parts aside for later installation.
Figure 2.26: Hand Rails and Exhaust Stack
Shipping Position
147962
20
Revision A
Содержание M Series
Страница 2: ...Featuring the Dual Direction and Ultra Glide suspension on the M155 and M205 Published in August 2016 ...
Страница 5: ...Figure 2 EC Declaration of Conformity Windrower Lift Sling Page 2 of 2 147962 iii Revision A ...
Страница 7: ...Figure 4 EC Declaration of Conformity Windrower Assembly Supports Page 2 of 2 147962 v Revision A ...
Страница 10: ......
Страница 20: ......
Страница 33: ...UNLOADING THE WINDROWER 9 Unhook the remaining sling Figure 2 24 Platforms 147962 19 Revision A ...
Страница 40: ......
Страница 166: ......
Страница 332: ......
Страница 395: ......