214323
40
Revision B
3.3
Break-in Period
Until you become familiar with the sound and feel of your new header, be extra attentive.
CAUTION
Before investigating an unusual sound or attempting to correct a problem, shut off engine and remove key.
After attaching the header to the combine for the first time, follow these steps:
1.
Operate the machine with the reels, drapers, and knives running slowly for five minutes. Watch and listen
FROM THE
OPERATOR
’
S SEAT
for binding or interfering parts.
NOTE:
Reels and side drapers will not operate until oil flow fills the lines.
2.
Refer to
6.3.2 Break-in Inspection, page 347
and perform all the specified tasks.
Содержание FD75
Страница 8: ......
Страница 43: ...214323 25 Revision B Figure 2 1 Header Width 1018123 A B PRODUCT OVERVIEW ...
Страница 71: ...214323 53 Revision B For more information refer to Table 3 4 page 51 OPERATION ...
Страница 306: ......
Страница 360: ......
Страница 524: ......
Страница 538: ......