MAAX Outlook Plus Series Скачать руководство пользователя страница 1

GUIDELINES

FOR UNIT

INSTALLATION

Outlook Plus Series

10032588

Read carefully before proceeding. TO BE KEPT BY THE END USER.

Keep the serial number for the unit

PLEASE READ INSTRUCTIONS CAREFULLY BEFORE PROCEEDING

Before starting

Upon reception, check if your shower is in good condition and make sure that all parts are included.  If you have a problem, please 

contact immediately your distributor.

Required equipment

•  Level 

• Measuring tape 

• Pencil

•  Electric drill 

• #8 x 1" wood screws  • Square

•  Silicone    

• Safety goggles 

•  Wood shims 

• Phillips screwdriver

•  Cement or similar composite material

WARNING:

For optimum operation, it is important that the unit be installed perfectly on a leveled floor. 

Handle metal parts with 

care. 

During installation, protect shower floor with the cardboard packaging. This will prevent damaging the finish.

DO NOT BUILD THE SURROUNDING STRUCTURE BEFORE RECEIVING YOUR UNIT. Structure measurements should be 

verified against the unit to ensure a proper fit.

The grab bars and seats must be installed before unit installation.

Consult local building codes to make sure the installation complies with standards.

MAAX is not responsible for problems caused by installations that were not conducted in compliance with the directives 

in this guide.

ATTENTION

In accordance with standards, the finished entrance height of shower stalls must not exceed ½ inch (13 mm).

Because of the possible water leaks between the lip of the shower and the curtain, MAAX RECOMMENDS THE 

INSTALLATION OF A FLOOR DRAIN OUTSIDE THE UNIT, in rooms where the aforementioned units will be installed.

OPS-3636

                           

106027-106028-106029-106030-106031-106032-106033

OPS-3636-RS                       

 

106064-106065-106066-106067-106068-106069-106070

OPS-4248

                                                     

106053-106054-106055-106056

OPS-4248-RS  

                                              

106083-106084-106085-106086

OPS-6030

          

106034-106035-106036-106037-106038-106039-106771-106772-106773

OPS-6030-RS

    

106071-106072-106073-106074-106075-106076-106774-106775-106776

OPS-6036

          

106040-106041-106042-106043-106044-106045-106777-106778-106779

OPS-6036-RS

    

106077-106078-106079-106080-106081-106082-106780-106781-106782

OPTS-6032

                         

106057-106058-106059-106060-106061-106062-106063

A two person installation 

is recommended.

View Installation Video

 - Scan QR code with a mobile device

Voir Vidéo d'installation

 - Balayer QR code avec un dispositif mobile 

Ver video de instalación

 - Escanear código QR con un dispositivo mobil

Содержание Outlook Plus Series

Страница 1: ...sure the installation complies with standards MAAX is not responsible for problems caused by installations that were not conducted in compliance with the directives in this guide ATTENTION In accordance with standards the finished entrance height of shower stalls must not exceed inch 13 mm Because of the possible water leaks between the lip of the shower and the curtain MAAX RECOMMENDS THE INSTALL...

Страница 2: ...in B min in C max in from the control wall ADA ANSI ADA ANSI N A Fig A 1 STEP FREE SPACE The bathroom configuration must include a clearance zone to allow the user to have access to the unit In order to respect these various standards refer to the table below It is very important that the free space respect the dimensions See Fig A and table For unit 3636 This unit does not meet ADA ANSI accesibil...

Страница 3: ...no stud behind the soap dish hole Construct the alcove in accordance with Fig A and table dimensions NOTE STRUCTURE MEASUREMENTS MUST BE VERIFIED AGAINST THE UNIT TO ENSURE A PROPER FIT All dimensions are expressed in inches and millimeters Note The following measurements are not those of the unit but those required for the installation for easier installation add 1 4 6 mm to dimensions A and B on...

Страница 4: ...C L L Shower control area Shower control area E G H F C C L L Shower control area I J Fig A ADA 36 30 Shower 36 x36 Shower 60 x36 Shower 60 x30 Tub shower 60 x32 30 ANSI 60 3 3 48 60 Standard A min in B min in C max in from the control wall ADA ANSI ADA ANSI N A Shower 36 x36 Shower 60 x36 Shower 60 x30 Tub shower 60 x32 Standard ANSI ADA E max in B max in 15 F min in C max in G min in D min in H ...

Страница 5: ... d Connect water supply lines so hot water left and cold water right are properly connected in relation to the valve body Fig B e The water pipe connecting the valve to the hand held shower connector must rise above the shower wall Fig D 2 Cold water Hole to fasten fitting flange Wood block 3 76 3mm High Shower Wood screw 8 x 1 Hot water Hole to fasten fitting flange Fig B 5 Plug Fig C NOTE Before...

Страница 6: ...sert it in the previously drilled hole as shown in Fig B The hand held shower connector must be fastened behind the unit s wall with the piping rising above the unit Fig C The hand held shower will rest on sliding support bar Fig C To valve Unit wall Drilled hole Ø 1 Hand held shower connector Vacuum breaker Silicone Height of the sliding bar 8 Fig A Fig B Fig C Piping above the unit Hand held sho...

Страница 7: ...asket to secure shower drain to shower floor Fig B Before final installation of the drain the unit shower or tub shower has to be completely installed To finish drain installation go to step 12 Under the base Friction ring Locknut Base Strainer Drain head Rubber calking gasket Locking wrench Calking nut Gasket Silicone 6 152 mm Drain pipe Stud wall Framing Sub floor see step 2 for correct measure ...

Страница 8: ...the depth Fig A B Using the depth project and trace a line as shown in fig B C Place the unit in the alcove use the traced line as a reference to help in positionning the unit Verify that everything fits drain pipe valve and soap dish Remove the unit from the alcove Fig C Fig A Fig B Fig C ...

Страница 9: ...previously marked line as shown Fig B Make sure that everything drain pipe and valve is on the right place Lower the unit slowly into place Fig B C Connect plumbing under the top horizontal stud as shown Connect plumbing and drainage according to standards Make sure that joints are waterproof Fig C Fig A Fig B Fig C Put cardboard on shower floor to protect the surface during installation ...

Страница 10: ...the unit in the frame If the option is chosen an opening for inserting the soap dish will be factory drilled Install the spring at the center of the soap dish support Fig A Then insert the support in the opening so that the support with the spring is compressed between the backing of the unit and the back wall Fig B Apply a bead of silicone around the pre drilled opening Screw the soap dish in the...

Страница 11: ...sides and the floor For the horizontal sides fasten a screw in front of each stud Use shims as needed to level the unit On reduced skirt models there is no fastening flange at the bottom therefore a bracket is needed to fasten the unit s bottom to the floor Start by checking that the unit is correctly positioned leveled and squared Fasten a screw in each bottom corner of the unit Fasten the bracke...

Страница 12: ...er supply has indeed been cut off IMPORTANT As mentioned in step 3 it is highly recommended to include an access to the plumbing connections measuring at least 30 x 28 762 mm x 711 mm This access will allow you to easily repair or disassemble the connections Assemble the valve as shown in Fig A Description Qty 1 Valve body 1 2 Chrome sleeve 1 3 Chrome face plate 1 4 Temperature limit stop 1 5 Face...

Страница 13: ... calking nut with locking wrench 3 provided to secure shower drain to pipe Fully tighten to ensure waterproofing Then remove the locking wrench D Push down strainer 4 until it snaps into place on top of shower drain Water test the unit by pouring water at different points in the shower and making sure it drains properly A 1 Drain pipe B 2 C 3 D CLICK 4 ...

Страница 14: ...oose code compliance comes easily Simply ensure the top of finished floor meets the start of the sloped exterior threshold 1 1 8 Codes require max level change Codes require max level change Codes require max level change Drain Drain Drain 1 1 8 Drain Ramp Finished floor Subfloor Important The finished height of the threshold must comply with the following standards US maximum height of 1 2 13mm i...

Страница 15: ...eramic tile etc should completely cover the fastening flange Fig A The joint between the wall panels and the finishing panels can be covered with a joint compound a plastic stripe or a tile strip To prevent water infiltration apply a bead of silicone between the floor and the threshold of the unit INSTALLATION 15 ...

Страница 16: ...MAAX Bath Inc offers express limited warranty on each of its products This warranty extends only to the original owner end user for personal household use For commercial uses additional limitations apply For accessing product Limited warranty please visit www maax com ca warranty LIMITED WARRANTY CANADA GARANTIE LIMITÉE CANADA MAAX Bath Inc offre une garantie limitée expresse sur chacun de ses pro...