253
DL30-G USERS MANUAL EM-8571-G Rev.2
Permanent schedule assignment
Schedule patterns which are valid only for specific dates can be set for the currently selected schedule unit by
specifying year, month, and date.
➔
3.13 Scheduling function setting
(1) Click [Permanent schedule assignment] button in the [Maintenance] window to display the [Schedule unit
list].
(2) Double-click the unit to change in the list to display the [Permanent schedule setting] window.
(3) Double-click the pattern to change to display the [Change setting] window.
Maintenance
1. Click
2. Double-click
3. Double-click
(4) Select the pattern and date to which to change and click [OK] to display the [Change setting confirmation]
dialog.
(5) Click [OK].
2 Click
1. Select
3. Click
NOTES
• For details of the specifications of the scheduling function, see [8.2.11 Schedule].