
Glide
Parts Bag
Unpack
Lower Drawer
Upper Drawer
Rods
www.lynkinc.com
3
4
5
in cabinet using Alignment Guide found
in parts bag
Align Glide Frame
Make sure
arrows are
pointing to
the front of
the cabinet.
Check for adequate clearance
around cabinet and doors
(Adjust glide frame position as needed.)
Check For Clearance
Temporarily place drawer from
step
3
onto glide frame with holes
in drawer and glide aligned.
2”
min.
Alignment
Guide
2”
min.
2”
min.
Roll-Out Double Drawer REV 9 If you have questions, please call 800-733-5965. © 2014Lynk , Inc. 8241 Melrose Drive, Lenexa, KS 66214
®
•
•
Parts Bag
Mounting
Screws (4)
Wood
Screws (6)
Instructions
Alignment
Guide
Lower Drawer Indicated by
Mounting Plates
1
Rod
Slide Upper Drawer
...
Corner
Tube
onto tops of rods until upper
drawer is fully in place
Note: Face drawer fronts
in same direction.
Insert Rods
into lower drawer (4 places)
Lower drawer indicated
by mounting plates.
2