Chapter 7: Installation 

__________________________________________________________________________________________ 

22 |  Installation, Operation & Maintenance Instructions EASYCHLORGEN

 

                                                                                        

 

 

7.3 Electrical Installation

 

 

   

 

WARNING 

 

Risk from electric shock! 

Electrostatic charges can inflict fatal injuries. 

Customised installations:

 The use of external product tanks 

equipped with supplementary mechanical ventilation and/or 

liquid transfer pumps may create risk of electrostatic shock. 

 

 The design of storage and transfer systems should be risk 

assessed by a competent person. 

 Additional earth bonding arrangements may be required in 

accordance with local electrical codes. 

 

 

 

All electrical work must be carried out by a trained electrician. 

7.3.1.  Wiring the PSU cabinet and EASYCHLORGEN  control 

panel 

Precondition for action: 

 

  PSU cabinet and EASYCHLORGEN located correctly  

  Identify system model/type 

Perform the following working steps: 

1.

 

Wire in accordance with the wiring diagrams detailed later in 

this section for the corresponding model  ensuring that the 

electrical installation is suitable for the voltage and kW rating 

of the unit, as indicated on the machine identification plate.  

Refer to Technical Data section 5.1 and 5.2. 

2.

 

Connect a mains 3-phase AC + Neutral power supply to the 

PSU cabinet isolator connection block.  A cable, conduit or 

electrical trunking connection will need to be carried out by 

an electrician for suitable entry of the electrical supply 

through the lower section of the  PSU  cabinet panel  as 

detailed in 4.2.3. 

3.

 

Earth the device in accordance with local regulations. 

4.

 

Interconnect the 115VAC power supply cable from the PSU 

cabinet to the EASYCHLORGEN control panel mains power 

isolator connection.  A 2C+E cable is factory fitted at the 

PSU cabinet for this purpose and may be replaced to 

comply with local regulatory requirements. 

5.

 

Interconnect  the  3-phase  AC  power supply from the PSU 

cabinet to the EASYCHLORGEN air blower rotary isolator.  

A 3C+E cable is factory fitted for this purpose and may be 

replaced to comply with local regulatory requirements. 

6.

 

Interconnect  the  multi-core  signal cable from the PSU 

cabinet to the EASYCHLORGEN control panel. A multi-core 

cable is factory fitted for this purpose and may be replaced 

to comply with local regulatory requirements. 

7.

 

Interconnect the 2-wire screened signal cable pre-wired at 

the  EASYCHLORGEN  control panel to the corresponding 

terminals at the PSU cabinet.  A screened cable is factory 

fitted for this purpose and may be replaced to comply with 

local regulatory requirements.  

IMPORTANT!  

Only earth 

the  signal cable screen at the EASYCHLORGEN  control 

panel and NOT at the PSU cabinet. 

8.

 

Interconnect  the  M12  yellow  cable assembly to the 

EASYCHLORGEN  control panel and the hydrogen gas 

detector.  An M20 connection point on the underside of the 

control panel is provided for this cable route. 

9.

 

Connect the external  product  tank  stop  level switch cable 

assembly to the EASYCHLORGEN control panel.  An M20 

connection point on the underside of the control panel is 

provided for this cable route. 

10.

 

Interconnect any auxiliary wiring (for devices supplied 

outside the scope of the standard system) using the spare 

cable glands provided. 

11.

 

IMPORTANT!

 Inside the PSU cabinet, locate the isolating 

power transformer,  ref.  XF-1.  This transformer allows a 

wide range of 3 phase supplies to be accommodated and 

provide  a fixed 115VAC single phase supply to the 

EASYCHLORGEN  Control Panel. 

Connect the voltage 

setting LINK WIRE/S according to the local 3Ø supply 

voltage as detailed in the table below. Failure to select 

the correct linkage may result in permanent damage to 

the EASYCHLORGEN control panel PCB! 

 

 

 

 

 

 

 

 

 

DANGER! 

Mortal danger from electric shock! 

Live parts can inflict fatal injuries. 

 

 Disconnect from the electricity supply before working on 

any equipment and secure all devices to prevent it from being 

switched on again. 

Содержание Jesco Easychlorgen 4250

Страница 1: ...0 Electrolysis system for on site hypochlorite generation Installation Operation Maintenance Instructions EN Read these operation and maintenance instructions before start up To be held for further re...

Страница 2: ...2 Installation Operation Maintenance Instructions EASYCHLORGEN...

Страница 3: ...5 5 2 POWER SUPPLY UNIT 15 6 DIMENSIONS 16 6 2 INTERMEDIATE BRINE TANK 17 6 3 POWER SUPPLY UNIT PSU CABINET 17 7 INSTALLATION 18 7 1 INSTALLATION LOCATION 18 7 2 HYDRAULIC INSTALLATION 19 7 3 ELECTRIC...

Страница 4: ...Identification of warnings Warnings are intended to help you recognize risks and avoid negative consequences This is how warnings are identified Warning sign SIGNAL WORD Description of danger Conseque...

Страница 5: ...as existing safety regulations at the plant In doing so the different technical qualifications have to be taken into account The operating personnel must have understood the training and it must be e...

Страница 6: ..._____________________ __________________________________________________________________________________________________ Date __________________________________________________________________________...

Страница 7: ...ards due to non compliance with the safety instructions Failure to follow the safety instructions may endanger not only persons but also the environment and the device failure of important functions o...

Страница 8: ...selves 2 5 2 Trained electricians Due to their professional training knowledge and experience as well as knowledge of speci c standards and provisions trained electricians are able to do the electrica...

Страница 9: ...hypochlorite solution produced is 0 6 0 1 Cl2 by weight 3 3 Device Revision This operating instruction manual applies to the following devices Device Month year of manufacture EASYCHLORGEN 4250 8500 1...

Страница 10: ...ric current to flow between the cell plates The generated product is delivered to the degassing tank 14 before transfer to an external product tank through the product outlet connection 16 When the pr...

Страница 11: ...nturi 3 Brine solenoid valve 4 Dilution solenoid valve 5 Chilled water solenoid valve 6 Water meter 7 Pressure regulating valve 8 Product sample tap 9 Air blower 10 Air flow sensor 11 System run stop...

Страница 12: ...ble The green generating indicator 5 is lit when the electrolyser D C output power is available A ventilation fan 3 operates continuously to draw in air at the base of the cabinet and discharge warm a...

Страница 13: ...ation Operation Maintenance Instructions EASYCHLORGEN No Power On start up Normal Operation Fault Condition 4 2 4 Function sequence in automatic operation The Start Delay timer can be set in the engin...

Страница 14: ...5 Rating Plate The rating plate contains information on the safety and functional method of the product The rating plate must be kept legible for the duration of the service life of the product No Des...

Страница 15: ...switch assembly PVDF PVC FPM PPS 5 1 7 Other data 5 1 8 External product tank storage facility option Model 4250 8500 Product tank capacity L Recommended minimum size of 1000L Refer to product output...

Страница 16: ...5 2 3 Other data Model 4250 8500 Net weight kg 210 270 6 Dimensions All dimensions in mm 6 1 EASYCHLORGEN 4250 8500 Key Description A Product outlet connection B DC power busbar connection ve C Acid w...

Страница 17: ...______________________________________________________________ 17 Installation Operation Maintenance Instructions EASYCHLORGEN 6 2 Intermediate brine tank 6 3 Power Supply Unit PSU cabinet Side elevat...

Страница 18: ...to installation schematics section 7 4 Perform the following steps 1 Locate the skid unit into its intended permanent position allowing sufficient space to connect services to the connection ports to...

Страница 19: ...o that inlet outlet pipe connections are conveniently situated for connection to appropriate services Location of salt saturator complete 7 2 Hydraulic installation 7 2 1 Cold feed water supply Note D...

Страница 20: ...aintenance Saturator plumbing complete 7 2 4 Intermediate brine tank The intermediate brine tank is vitally important to maintain a steady supply of brine to the EASYCHLORGEN skid system The level of...

Страница 21: ...requirements the vent termination point on the external wall should not be located directly beneath any air intake and must be located at least 0 8m from any window or possible source of ignition If t...

Страница 22: ...ments 5 Interconnect the 3 phase AC power supply from the PSU cabinet to the EASYCHLORGEN air blower rotary isolator A 3C E cable is factory fitted for this purpose and may be replaced to comply with...

Страница 23: ...y the square flat connector plates supplied with the PSU Due to the high DC current output of the PSU it is vital that all DC connections are made with care Ensure all bare copper busbar surfaces are...

Страница 24: ...pply for hydrogen sensor 30 N C Ext Alarm N C External N C Emergency alarm linked to terminal 15 when not in use 31 0V Common 0V 32 Sig Panel Temp panel temperature signal input 33 0V Common 0V 34 Sig...

Страница 25: ...Installation __________________________________________________________________________________________ 25 Installation Operation Maintenance Instructions EASYCHLORGEN 7 3 4 Control Panel PCB Termina...

Страница 26: ...__________________________________________________________________________________________ 26 Installation Operation Maintenance Instructions EASYCHLORGEN 7 3 5 4250 8500 Power Supply Cabinet Compone...

Страница 27: ...ion __________________________________________________________________________________________ 27 Installation Operation Maintenance Instructions EASYCHLORGEN 7 3 6 4250 Control Panel to Power Supply...

Страница 28: ...Installation __________________________________________________________________________________________ 28 Installation Operation Maintenance Instructions EASYCHLORGEN 7 3 7 4250 Power Circuit Wiring...

Страница 29: ...ion __________________________________________________________________________________________ 29 Installation Operation Maintenance Instructions EASYCHLORGEN 7 3 8 8500 Control Panel to Power Supply...

Страница 30: ...Installation __________________________________________________________________________________________ 30 Installation Operation Maintenance Instructions EASYCHLORGEN 7 3 9 8500 Power Circuit Wiring...

Страница 31: ...______________________________________________________________ 31 Installation Operation Maintenance Instructions EASYCHLORGEN 7 4 General installation layouts 7 4 1 Electrolytic plant Installation la...

Страница 32: ...___________________________________________________________________________________ 32 Installation Operation Maintenance Instructions EASYCHLORGEN Single plant room facility Installation example 2 7...

Страница 33: ...water supply 10 Saturator isolation valve 11 Intermediate brine tank isolation valve 12 Intermediate brine tank 13 EASYCHLORGEN potable softened water supply 14 EASYCHLORGEN saturated brine feed 15 B...

Страница 34: ...tion __________________________________________________________________________________________ 34 Installation Operation Maintenance Instructions EASYCHLORGEN 7 4 3 General installation arrangement E...

Страница 35: ...ection button ENTER selection confirmation button The control interface also indicates current operational system status via three bright LEDs Green LED system healthy Amber LED maintenance action Red...

Страница 36: ...result for hard water The result MUST BE GREEN i e soft water DO NOT PROCEED further until a reliable softened water supply is available The salt saturator is filled with a pre charge of the correct...

Страница 37: ...Program 1 End Program Mode is reached At this point press ENTER and the display will return to the MANUAL INHIBIT screen 6 To restart the system press and hold the scroll UP key for 5 seconds 7 EASYC...

Страница 38: ...eneration cycle When the softener is in regeneration the EASYCHLORGEN should stop and the screen will display If the above screen is not displayed then this may be a result that the softener regenerat...

Страница 39: ...t door main isolator 5 Disengage the Emergency Stop button by twisting and pulling outward 6 The Power On white lamp will illuminate indicating that there is power available to the system Perform the...

Страница 40: ...process Whilst the system is displaying SYSTEM STOPPED the scroll UP key may be pressed for 5 seconds to place the system into MANUAL INHIBIT mode which halts the automatic operation Press the scroll...

Страница 41: ...alarm device will activate The EASYCHLORGEN system will need to be reset on the panel by pressing the ENTER button once the Emergency Stop device has been released 10 6 Record Log of Operation To mai...

Страница 42: ...sary any inlet outlet valves associated with product storage tank s System shut down for the long term 11 3 Storage Required actions The system has been shut down in accordance with the section 11 2 L...

Страница 43: ...seals gaskets 12 1 1 Clean replace brine strainer screen Depending on quality of the softened cold water supply and salt specification the in line strainer screen protecting the brine control solenoi...

Страница 44: ...ution WARNING Increased risk of accidents due to chemical exposure A residual of brine chlorine solution may drip from the pipe work and fittings Wear correct personal protective equipment Wipe away a...

Страница 45: ...dure as per section 9 2 1 3 Replace the hydrogen sensor if a reading is above normal range 70 b sensor is known to have been damaged by exposure to water emersion or fire damage c sensor has been in o...

Страница 46: ...owing working steps 1 Drain the brine product solution pipe work and electrolyser s by opening the brine salinity sample point valve Allow the contents to empty into a clean plastic container until th...

Страница 47: ...ing steps 1 Make a note of the date and scope of the maintenance performed 2 Complete any operational service or commissioning log sheets associated with the EASYCHLORGEN system and as per any associa...

Страница 48: ..._________________________________________ 48 Installation Operation Maintenance Instructions EASYCHLORGEN 12 4 Location of maintenance parts 12 4 1 Left side electrolyser compartment Detail A Detail B...

Страница 49: ...ion Maintenance Instructions EASYCHLORGEN Detail F 12 4 3 Hydraulic control apparatus Detail G Detail H Table Maintenance Parts List Key Item description detail A H 1 DN25 Union O ring 2 DN15 NRV O ri...

Страница 50: ...d Reset Wire Breakage Loose connection Check wiring and ensure switch is NC when Healthy System Fault Hydrogen Sensor Hydrogen Level has exceeded 100 of the alarm value 25 LEL Broken or damaged pipe w...

Страница 51: ...ription 4250 8500 200 206 Biennial maintenance kit 14 2 Critical site spares Code Description 210 006 Ventilation air flow sensor 8 GP0219 Ventilation air blower 3 phase 210 018 Hydrogen gas sensor 21...

Страница 52: ...e Part no Reason for repair Dosing medium Description Irritating Yes No Properties Corrosive Yes No Wehereby certify that the product has been cleaned thoroughly inside and outside before returning th...

Страница 53: ...warranty application filled out Sender Company Phone Date Address Contact person Manufacturer order no Date of delivery Device type Serial number Nominal capacity nominal pressure Description of faul...

Страница 54: ...ETER READING V AMP READING A TEMP READING o C HOURS RUN AIRFLOW RATE m3 hr HARDNESS TEST Green Red PRODUCT TEST Av Cl2 PRODUCT TEST S G HYDROGEN SENSOR TEST QUANTITY OF SALT ADDED WATER SOFTENER Setti...

Страница 55: ...EASYCHLORGEN Appendix II Operators Log a When salt is added b When visiting site approximately weekly DATE OF VISIT VOLTMETER READING V AMP READING A AIRFLOW RATE m 3 hr HYDROGEN SENSOR PRODUCT TEMP o...

Страница 56: ...id Valves 1 Water Correct operation 2 Brine Correct operation 3 Dilution Correct operation Hydrogen Sensor 1 Correct operation Brine Tank 1 Check for leaks and clean tank Control Panel Check 1 Termina...

Страница 57: ...______________________________________________________ 57 Installation Operation Maintenance Instructions EASYCHLORGEN Appendix IV Softening Equipment Installation Operation Maintenance Guide Clack WS...

Страница 58: ...checks Fitting the distribution systems Adding the media Fitting the valves Brine tank connections Duplex hydraulic connections DLFC drain line flow control Injectors Electrical Connections Quickstart...

Страница 59: ...ystem Check that you have allowed space for access to the unit for possible future maintenance This installation may require plumbing work and will require an electrical outlet to be fitted near the s...

Страница 60: ...has been added Fig A 1 Fig A 2 Fig A 3 2 3 Adding the Media Block the top of the riser tubes to stop media getting down the tubes see fig A 3 Add about 1 3 by volume of water to the vessels so when th...

Страница 61: ...ghten by tapping the rear side of the valve with the palm of your hand fig A 6 Fig A 6 2 5 Brine Tank Connections Attach the brine line tubing to the brine tank and valves using the connectors fitted...

Страница 62: ...k has been installed this will control the backwash flow rate and ensure the system will continue to function correctly The DLFC is fitted inside the drain line elbow See below picture of the drain li...

Страница 63: ...late And strain relief as shown in Fig A 9a Fig A 9a You can now re install the drive bracket into its original position Please make sure that this has been replaced correctly as this can cause proble...

Страница 64: ...nt should be made using the up and down arrows when the setting you wish to adjust is displayed on screen Set Time of Day Press SET CLOCK Adjust the hours and press NEXT to adjust the minutes press NE...

Страница 65: ...EXT to adjust the minutes press NEXT to return to the normal TIME display Step 1 Cycle Sequence Press NEXT and DOWN simultaneously for 3 seconds and release The screen will display SOFTENING flashing...

Страница 66: ...l requires a maximum of 150 litres of softener resin The duplex 1665 softener system is capable of treating a water volume of up to 18m3 at a hardness of 400 ppm CaCO3 Lower water hardness value resul...

Страница 67: ...note 9 DP Setting Off or see note 2 for options Hardness PPM Set 1 Backwash Set 2 Brine Draw dn Set 3 Rinse Set 4 Fill Salt required Set 5 End Step 2 System Setup Press NEXT and DOWN simultaneously f...

Страница 68: ...is closed a regeneration will be prevented 3 Auto Capacity is automatically calculated and a reserve will be estimated OFF Regenerations will be controlled from the day override setting user settings...

Страница 69: ...ackwash the system will move through a brine draw routine rinse and fill before stopping in the service position For new systems or after a media change it maybe necessary to run two regenerations to...

Страница 70: ...enance and does not normally require much adjustment Weekly Check the salt level this may need to be done more regularly dependant on consumption The salt level should always be above the water level...

Страница 71: ...nstallation Operation Maintenance Instructions EASYCHLORGEN 6 Troubleshooting On the following pages you will find a guide as to the most common problems that may arise please consult this section bef...

Страница 72: ...Appendix IV ____________________________________________________________________________________________ 72 Installation Operation Maintenance Instructions EASYCHLORGEN...

Страница 73: ...Appendix IV ____________________________________________________________________________________________ 73 Installation Operation Maintenance Instructions EASYCHLORGEN...

Страница 74: ...Appendix IV ____________________________________________________________________________________________ 74 Installation Operation Maintenance Instructions EASYCHLORGEN...

Страница 75: ...Intended Use 10 L language 39 Long term shutdown 43 M Maintenance 44 47 Maintenance brine strainer 44 Maintenance finishing 48 Maintenance gaskets 45 Maintenance Hydrogen gas detector 46 Maintenance...

Отзывы: