Section 9: Operation
P a g e | 31
9 Operation
9.1 Control Function Sequences
Note:
•
Diagrams shows simplified
Easyzon D
processes.
•
See section 9.2 for information on system fault/alarm states.
•
See section 8.3 for information on program settings for Remote Inhibit/Alar
m
Delay’s.
Power on
Yes
A
cknowledge
alarm
No
Active
alarm?
No
Unit in standby
‘Batch tank full’
Batch cycle
underway
Chemical 1 valve
open (preset
amount of pulses)
Chemical 2 valve
open (preset
amount of pulses)
Dilution cycle
complete - valve
off
Cycle time
counter complete
Yes
Batch
tank full?
Dilution
valve on
No
Active
alarm?
Yes
System warning
status for alarm
delay period
System stopped
–
Alarm state
activated
Alarm
Reset?
No
Yes
Remote Inhibit -
Open circuit
Easyzon
immediately
enters Remote Inhibit
status until circuit is
closed
System healthy -
unit
Generating
Diagram 1: Clo
₂
Production process
Diagram 2: Alarm/Fault state sequence
Diagram 3: Remote Inhibit sequence
Process demand
uses product
–
batch tank level
switch drops
Restart delay
countdown begins
Restart delay
countdown
completes
Содержание Easyzon D 100
Страница 2: ...This page is left intentionally blank...
Страница 10: ...Section 3 Technical Data P a g e 7 3 2 Dimensions 3 2 1 Easyzon D Skid dimensions...
Страница 17: ...Section 6 Installation P a g e 1 4...
Страница 21: ...Section 6 Installation P a g e 18 6 5 2 Field Wiring Diagram Easyzon D PCB Iss 4 electrical diagram...
Страница 45: ......