Section 6: Installation
P a g e | 12
6 Installation
6.1 Components
The standard components supplied with the
Eayzon D
s
ystem that are required to be installed are as follows:
•
Easyzon D
Skid
6.2 Location
6.2.1
Requirements
Certain location conditions are to be met prior to
installation, to ensure safe and optimal operation of the
system.
Location conditions:
✓
There is access to a permanent water supply
for connection to the
Easyzon D
✓
The water supply is of a constant pressure of 2
bar or above with minimal fluctuations
✓
There is access to the main water line for
product injection
✓
Temperature, humidity and water quality are
under the specified limits (see section 3.8)
✓
There is access to a power supply
✓
There is a floor drain for flushing away of
chemicals if spillage was to occur
✓
There is adequate ventilation and lighting
✓
It is safe from unauthorised access
✓
It meets all local regulations including fire safety
and accident prevention laws.
✓
The floor is made of concrete and is level
✓
There is sufficient protection from frost
✓
Storage of chemicals has been approved and
there are adequate facilities to do so.
✓
Chemical tanks are positioned so suction lines
are <50m.
DANGER
Incorrect installation can compromise safety!
This can expose personnel and the surrounding
environment to hazards.
•
Adhere to safety precautions and instructions for
correct installation in this manual.
•
Only trained/specialist personnel may perform
installation work/maintenance (see section 2.4)
•
It is recommended that stickers/labels/tags are
to be used to notify users of any potential
hazards.
Содержание Easyzon D 100
Страница 2: ...This page is left intentionally blank...
Страница 10: ...Section 3 Technical Data P a g e 7 3 2 Dimensions 3 2 1 Easyzon D Skid dimensions...
Страница 17: ...Section 6 Installation P a g e 1 4...
Страница 21: ...Section 6 Installation P a g e 18 6 5 2 Field Wiring Diagram Easyzon D PCB Iss 4 electrical diagram...
Страница 45: ......