manualshive.com logo in svg
background image

Limelight

Lutron Electronics Co., Inc. 7200 Suter Road

Coopersburg, PA 18036-1299 USA

Customer Assistance  |  1.844.LUTRON1  

USA, Canada, and the Caribbean

  |  +1.610.282.3800 

Others

  |  www.lutron.com

     

Part of the Limelight by Lutron System

Limelight by Lutron  

Gateway Panel Installation

English

  Important Notes: 

•  Check to see that the device type and rating is suitable for the application.

• 

DO NOT

 install if product has any visible damage.

•  Operate between -4 °F – 122 °F (-20 °C – 50 °C), ambient.

•  For more information, see  

www.lutron.com/TechnicalDocumentLibrary/3691100.pdf

•  Install in accordance with all local and national electrical codes.

•  Equipment is intended for installation in a restricted access area.

•  Protective earthing is provided by the socket outlet, which powers the 

gateway. All wiring must be verified by a licensed electrician.

•  Socket outlet shall be easily accessible after installation.

•  Install within 5 ft (1.5 m) of a power outlet/receptacle (power cord length  

is 5 ft [1.5 m]).

•  Product weight is approximately 7.5 lbs (3.4 kg).

•  Gateway: For Emergency applications – The gateway MUST be installed 

on normal power only (NOT Emergency) for proper system functionality.

•  Fixtures: For Emergency applications – Devices require a 1 second delay 

before emergency power is applied after loss of normal power for proper 

system functionality. To ensure proper system functionality, this device 

CANNOT be installed on an Uninterruptable Power Supply (UPS)  

backup system.

Standards: 

•  cULus Listed

•  FCC15.247 / IC  RSS-247 

LL-ETHGATE
LL-CELLGATE  

Please read before installing

120 V

~

  60 Hz 0.6 A maximum 

current draw, 15 W (51.2 BTU/hr) 

max power consumption 

041663 

Rev. E

05/2020

FCC / IC  Information

This device complies with part 15 of the FCC Rules and Industry Canada license-
exempt RSS standard(s). Operation is subject to the following two conditions:
(1) This device may not cause interference, and
(2) This device must accept any interference, including interference that may cause 
undesired operation. Modifications not expressly approved by Lutron Electronics Co., 
Inc. could void the user’s authority to operate this equipment.

Note:

 This equipment has been tested and found to comply with the limits for 

a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are 
designed to provide reasonable protection against harmful interference in a residential 
installation. This equipment generates, uses and can radiate radio frequency energy 
and, if not installed and used in accordance with the instructions, may cause 
harmful interference to radio communications. However, there is no guarantee that 
interference will not occur in a particular installation. If this equipment does cause 
harmful interference to radio or television reception, which can be determined by 
turning the equipment off and on, the user is encouraged to try to correct the 
interference by one or more of the following measures:

• Reorient or relocate the receiving antenna
• Increase the separation between the equipment and receiver
•  Connect the equipment into an outlet on a circuit different from that to which the 

receiver is connected

• Consult the dealer or an experienced radio/TV technician for help

)

Lutron, Lutron, and Limelight are trademarks or registered trademarks of Lutron Electronics Co., Inc. in the US and/or other countries.

©2018–2020 Lutron Electronics Co., Inc.

Installation

1. Install provided antenna(s). For LL-CELLGATE: install antennas in designated ports indicated by product label.

2. Follow Mounting Notes and Wireless Range table below to mount the gateway. Keep in mind it may need to 

be relocated to improve performance.

3. For LL-ETHGATE: Configure IT Network per IT guide (www.lutron.com/limelightITguide) and wire Ethernet 

cable to the gateway.

4. Power the gateway and monitor the display for any connection issues. Refer to Troubleshooting section if 

errors occur.

Mounting Notes

•  Four (4) mounting brackets pre-attached

•  Wall anchors (supplied by others)

•  Mount vertical with space for field service access to side connectors

•  Do not install in direct exposure to the sun or the elements (suggested installation location is in a  

maintenance closet)

•  Mount away from dense metal obstructions (maintain at least 2 ft [0.6 m])

•  Mount in a location that minimizes the distance from the farthest controlled fixture

Connections

•  Ethernet (LL-ETHGATE only)

  – CAT5 (or equivalent) cable, straight-through wiring (T568B) cable supplied by others

  – Field wired with RJ45 Ethernet plug (by others)

  – Waterproof mating connector

    ·  Requires field crimped connector (RJ45 crimp tool supplied by others)

  – IT Network Configuration: www.lutron.com/limelightITguide

•  Cellular (LL-CELLGATE only)

  – Verizon 4G LTE technology

  –  Ethernet connection is disabled from being used as the system connection. Intended for Lutron Field 

Service Representatives only

Wireless Range Best Practices

RF range recommendations

Parking Garage 

Flat lot

3 nodes within this distance of the gateway

50 ft (15.2 m)

150 ft* (45.7 m)

Max distance from the gateway to any one node

500 ft (152.4 m)

3000 ft (914.4 m)

Max distance from node to node

50 ft (15.2 m)

150 ft (45.7 m)

Gateway proximity to dense metal obstructions 
(including electrical panels)

Minimum 2 ft (0.6 m) away at height of no 
less than 6 ft (1.8 m)

Minimum 2 ft (0.6 m) away at 
height of no less than  
6 ft (1.8 m)

Max number of luminaires controlled by a single 
gateway

Up to 800, as long as no other range 
restrictions are violated. Nodes should be 
no farther than 4 floors above or below the 
gateway. 

Up to 800, as long as no 
other range restrictions are 
violated

Cloud Connection

Status Rev 2.3

DISPLAY

Limelight

Cellular Antenna 

Node Antenna

Mounting 
Brackets (4)

PWR 

LED

LL-ETHGATE

Limelight by Lutron Gateway with Ethernet 

connection, IP65 capable when Ethernet is 

installed in the provided grommet,  

120 V

~

  60 Hz with 5 ft (1.5 m) power cord

LL-CELLGATE

Limelight by Lutron Gateway with cellular 

connection, IP65 capable when Ethernet is 

installed in the provided grommet,  

120 V

~

  60 Hz with 5 ft (1.5 m) power cord

To network (QS-EO or 
Corporate ethernet network)  
(LL-ETHGATE only)

To network (QS-EO 
or Corporate ethernet 
network)

To Limelight by Lutron 
cloud

To Limelight by Lutron 
system nodes

To Limelight by Lutron 
system nodes

Typical One-Line Diagram Components

Troubleshooting

   Shortly after power is applied, the gateway will initiate a self-check sequence. The full self-check sequence runs  

~4 minutes and repeats twice. Errors encountered will appear on the screen.

Symptoms

Possible Solutions

LCD is OFF

–   LCD light turns off after self-check is complete. This does not signify an issue on its own

–   If the Power LED next to the power cord is also off, verify power is connected to the 

gateway

LCD Error: Ethernet 
Unavailable

–  Verify that the wired Ethernet is connected properly

–   Verify the IT Implementation Guide was followed for the Ethernet port that was wired to 

the gateway: www.lutron.com/limelightITguide

LCD Error: XXX Port XXX 
FAIL

–   Verify the IT Implementation Guide was followed for the Ethernet port that was wired to 

the gateway: www.lutron.com/limelightITguide

No Cell Signal

–   Verify antennas were installed correctly per gateway labels and product images in this 

document

–  Verify there is no dense metal obstructions within 2 ft (0.6 m) of the antennas 

–   Relocate the Cellular Gateway (LL-CELLGATE) to an area with stronger 4G LTE Verizon 

coverage

Other Errors

Contact Lutron Customer Assistance at 1.844.LUTRON1

 *   If the gateway is not at or above ground level or there is more than one wall between the gateway and nodes, the 50 ft (15.2 m) 

spacing guideline should be used.

E

Limelight

Отзывы: