363-205-401
Power Up:
Issue 7, March 1997
Page 1 of 4
NTP-007
Turn Up ED-7C704-30 Bulk Power Plant in 80E or
80D Cabinet
DO ITEMS BELOW IN ORDER LISTED
FOR DETAILS, GO TO
1.
This procedure provides steps for the initial installation of the bat-
tery strings, CS7787B540 power units in the Rectifier shelf, and
the ringing generator units in the J1C182BC Ring Shelf
(non-FTTH) in an 80D or 80E-type cabinet equipped with the
ED-7C704-30 Bulk Power Plant.
This procedure assumes the following;
• The outside cable pairs are not connected through to the RT
(protectors not installed) so that the RT is isolated from the
digital lines and derived pairs.
• The cabinet housing the RT has been installed.
• The J1C182AE or J1C182AF dual channel bank assemblies
(up to 8) have been installed in the cabinet.
• The Optical Power shelf, for FTTH only, has been installed in
the cabinet.
• The miscellaneous pair panel, protector connectors, ring
shelf, power unit (rectifier) shelf, control and distribution
panel, and fan shelves have been installed in the cabinet.
• The applicable acceptance TAB procedures in this volume
have been performed.
This procedure contains instructions concerning the installation of
batteries into the cabinet and the various units into the RT assem-
bly shelves, ring shelf, rectifier shelf, verifying that the units are
operating properly, and verify power feds to all equipment bays in
the cabinet prior to turning up RT channel banks or other carrier
facility shelf equipment.