363-208-010
Installation Procedures
Issue 5
May 1997
2-21
Ancillary Equipment
The ordering and placement of the following
4TEL RMU
*
and Reliance OEM items
shall be done in accordance with the instructions within the manuals for the
subject equipment. The figures referenced herein convey only suggested
locations within the
SLC-2000 bays; and may be restricted because of cable
length limitations.
NOTE
:
The use of either the
4TEL RMU, LTF, and Reliance INTS or combinations
thereof requires an auxiliary power source outside of the
SLC-2000 equip-
ment such as the Reliance Fuse Alarm Panel.
Line Test Fanout (LTF)
If a LTF is required (multiple
SLC-2000 systems within one RT), and the RMU is
provided, it shall be installed as indicated in Figure 2-8.
NOTE
:
The left and right mounting brackets are not part of the LTF and must be
provided separately.
If a LTF is associated with the Reliance INTS only, then it must be mounted on its
own mounting shelf.
4TEL RMU
Mount the
RMU or RMU/LTF with the required auxiliary fuse panel within 6 inches
of each other at the top of the equipment bay suggested by Figure 2-9.
Reliance INTS
Mount the Reliance INTS with the required auxiliary fuse panel within 6 inches of
each other at the top of the equipment bay suggested by Figure 2-10.
* 4TEL and RMU are registered trademarks of Teradyne, Inc.
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...