![Lucent Technologies Orinoco WavePOINT II Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/lucent-technologies/orinoco-wavepoint-ii/orinoco-wavepoint-ii_getting-started-manual_1946529033.webp)
2-14
ORINOCO WavePOINT-II - Getting Started
Installing the WavePOINT-II AP - Powering-up
Powering-up
2
The ORiNOCO WavePOINT-II AP power supply accepts any input AC
voltage in the range of 100-240 VAC.
!
WARNING:
For your own safety, use only the power cord supplied with the unit.
Insert it in a grounded AC wall outlet.
When using the unit in combination with outdoor antennas, the
grounding of the AC wall outlet must be connected to the safety
grounding system of the outdoor antenna system and the
ORiNOCO Lightning Protector.
When powered on, the WavePOINT-II AP unit will perform start-up
diagnostics characterized by a LED sequence. The LEDs will change color in
the range Amber, Red and Green. When finished (after about 15 seconds)
the WavePOINT-II AP will start bridging operation characterized by the LED
activity as listed in Table 2-1.
Содержание Orinoco WavePOINT II
Страница 1: ......
Страница 5: ...Table of Contents iv ORINOCO WavePOINT II Getting Started...
Страница 17: ...1 12 ORINOCO WavePOINT II Getting Started Welcome Kit Contents Figure 1 3 WavePOINT II AP Kit Contents...
Страница 19: ......
Страница 35: ......
Страница 51: ......
Страница 55: ......
Страница 61: ......
Страница 63: ......