PSU at a Polled Site
7-4
Issue 1 January 1997
Powering Up the Unit
1. Plug the PSU power cord into the “10-12VAC” jack and into a power outlet.
2.
To secure the cord, wind it one or two turns through the wire clip on the PSU back
panel.
3.
Turn the PSU “ON/OFF” switch to “ON”.
You should see the front panel “Power” light flash, then turn solid green. If
your communications system is passing SMDR, you should see the “Data In”
light flash as the PSU receives it.
Contact the hotline as instructed on the inside front cover if you are
experiencing difficulties.
Setting Up the Site
Contact the Central Site to add this site to the Central Site database. Make certain the
Call Collection Interface for the site is set EXACTLY as follows:
Protocol
PollComm
Port =
PC port used to poll this site
Baud Rate =
see step 3 of Configuring the Unit
Remote System Phone Number =
PSU modem’s phone number
(Not required in a direct connection)
Remote System User ID = UserId
Remote System Password = UserPswd
Remote System UCT Difference* =
* The hour difference between the PSU's
location and Greenwich's time.
Enter value according to PSU's time zone:
4:00 (Atlantic), 5:00 (Eastern), 6:00
(Central), 7:00 (Mountain), 8:00
(Pacific), 9:00 (Alaska), 10:00 (Hawaii)
Local System =
leave BLANK all fields
Format
(999) MERLIN LEGEND II x.x
When you poll this site, verify that call records are received and processed properly at
the Central Site's end.
This completes the installation of the PSU as the source of call records for a MERLIN
LEGEND Reporter site.
Содержание MERLIN LEGEND Reporter
Страница 1: ...MERLIN LEGEND Reporter Installation and Use...
Страница 96: ...PSU at a Polled Site Issue 1 January 1997 7 5...
Страница 121: ...Worksheets Issue 1 January 1997 A 15...