Lucent Technologies Lineage
®
2000 400A, 60Hz Ferroresonant Rectifier J85503C-3
Issue 10 July 2000
Installation 5 - 9
Handling
Equipment
Each J85503C-3 rectifier weighs at least 603 kilograms (1330 pounds).
Therefore, make arrangements to have the appropriate material handling
facilities and equipment to unload, uncrate, and set up the rectifier.
Proper handling is necessary to ensure personal safety and protect the
equipment. Each rectifier is shipped in a tri-walled corrugated cardboard
container secured to a wooden shipping skid. Move the container with a
forklift.
Lucent Technologies recommends that you use four lifting eyebolts to
facilitate placing the rectifier upright in the central office. The four holes
accommodate customer supplied lifting eyebolts. The holes are 5/8-11
threaded. For safety reasons, use all four eyebolts. After the rectifiers are
in place and the eyebolts removed, the 5/8-11 holes may be used for the
threaded rods used to support cable racks.
Unpacking
Move the crated rectifier to a convenient area for uncrating and follow
the steps listed below.
1. Remove any shipping bands.
2. Check “tilt” or “shock” indicators. If tripped, contact shipping
company and process claims form.
3. Pry off top, then sides of crate.
4. Inspect exposed exterior of rectifier for shipping damage.
5. With rectifier lying on its back, open the front door and visually
inspect for shipping damage.
6. If material is damaged, contact shipping company and process
claims form.
7. Remove parts package from inside rectifier.
8. Verify that the main ac voltage at your distribution panel agrees
with the input specified on the label inside the rectifier door.
9. Using all four lifting eyebolts and appropriate material handling
equipment, raise the rectifier from the pallet and set it on the floor
in its upright vertical position.