Lucent Technologies Lineage
®
2000 50A Ferroresonant Rectifier J85502B-1
8 - 8 Spare Parts and Replacement Procedures
Issue 6 May 1999
9. Disconnect the J3A connector on the cable from the CM3
digital meter board.
10. Remove the CM2 control board from the six support
standoffs by using a small flat-blade screwdriver to push in
the latches on each standoff.
11. Position the new CM2 control board over the six standoffs.
Verify that each latch snaps and locks in place.
12. Connect J3A to P3A on the new CM2 control board.
13. If CM5 is not used, reconnect the ribbon cable to P1A on
the new CM2 board.
If CM5 is used, reconnect it to CM2; reconnect the Y, R,
and S leads of CM5 onto points E2, E4, and E9,
respectively, of CM2. (The BK and W leads of CM5, if
not removed in Step 8, are not to be reconnected.)
14. If the rectifier is to be restored to service, refer to
“Restoring a Rectifier to Service” in Section 7.
Replacing CM3
Digital Meter
Board
Follow instructions in “Handling Circuit Modules” to minimize
electrostatic discharge when handling circuit modules.
1. Turn the rectifier POWER switch Off.
2. Turn the rectifier (CBA1) DC OUTPUT circuit breaker
Off (down).
3. At the ac service panel supplying power to the rectifier,
remove the input fuses assigned to the rectifier or turn the
circuit breaker Off.
4. At the plant controller, remove the REG fuse associated
with the rectifier.
5. At the rectifier, loosen the locking screws and open the
door.