Acceptance Testing 5 - 3
Recheck the SW103 setting, raise the plant voltage back to
normal, and repeat Step 5 by adjusting the rectifier voltage
down slowly. Refer to the rectifier product manual for
voltage adjustment procedures.
6. With the BD alarm present, check with a multimeter or
with the office alarm system (if connected) that the
following alarms are present on the controller terminal
blocks:
BDE, PMJE, PMJV, and PMJA
The terminal block positions are listed on a label inside the
controller.
7. Slowly adjust the rectifier output voltage back up to
normal, or turn the rectifier back on (i.e., reverse Step 5).
Observe that the BD LED extinguishes at the correct
voltage level, within the specified tolerance. The green
NORM LED should light when the BD LED goes out.
8. Check the office alarms on the 113B terminal blocks to
verify that no alarms are present.
9. If the test fails, replace the 113B.
10. Restore the plant to normal service. Allow approximately
the same amount of time as required for the above test to
recharge the batteries before proceeding.
Float and
Equalize Control
Test
If the equalize function is disabled on the 113B or if the plant is
not equipped with equalize-capable rectifiers, skip this test. A
test load is not required for this test.
1. Use the front panel switch to put the plant in equalize
mode. Verify that the equalize LED lights on the controller
and that the rectifiers change to their equalize voltage
settings. Readjust the equalize voltage of each rectifier, as
required. (Refer to the rectifier product manual for voltage
adjustment procedures.)
2. Return plant to float mode with the front panel switch. The
equalize LED should extinguish.