Lucent Technologies Lineage
®
2000 ECS Battery Plant H569-403
Issue 4 February 1997
Installation 4 - 1
4
Installation
General
As mentioned at the beginning of Section 3, Lucent offers
complete engineering and installation service that result in
turn-key plant operation. Contact your Lucent Power Systems
Account Executive for further information on the complete
range of installation services available from Lucent. Customers
may, however, choose to make their own arrangements to fully
or partially install the battery plant based on the information
supplied here.
This section outlines an efficient sequence of battery plant
installation steps that minimizes the installer's exposure to live
circuits. Upgrades, retrofits and replacement of equipment in the
controller, rectifier and battery subsystems are covered in their
respective manuals.
The framework, rectifier, controller and dc distribution
subsystems, described in Section 2, are factory tested as a
system. The controller and distribution subsystems are shipped
assembled to the framework, ready for use. To improve shipping
and handling, the rectifiers are packaged separately and must be
plugged into their shelf assemblies during the plant installation
process. The battery subsystem must also be assembled by the
installer. The battery plant installation sequence that follows
refers to the Rectifier, Controller and Battery manuals for details
for those subsystems. Read this section and the referenced
sections in other subsystem manuals completely before starting
any work.
Installation
Tools and Test
Equipment
The following tools and test equipment are required for battery
plant installation and testing.