
Task 14: Perform Initial DEFINITY AUDIX Administration
Issue 2 December 1996
3-19
Set Switch-Link Parameters for DS Integration
This part of the task is required only if the DEFINITY AUDIX system will be
running in DS integration mode. Check Worksheet C-1:
Activate Customer
Options
, to see if the switch integration type is to be display-set. If so, enter
change switch-link at the DEFINITY AUDIX command line.
If the switch to be installed does indeed use DS Integration, the screen that
appears will be labeled
Switch Link Embedded
. This screen is used to establish
two conditions: first, which AUDIX system is to be integrated into which switch,
and second, how a call is to be treated when the call answer timeout period
expires.
The screen that appears resembles the following illustration:
Perform the following steps:
1. Enter in the Host Switch field the switch number assigned to the switch
into which the AUDIX system is installed.
2. Enter in the AUDIX field the machine number of the AUDIX system being
installed.
3. Enter in the Call Answer Timeout field the number of seconds the system
shall wait for touch-tone digits when it answers a call without receiving a
“connect” message. (At the end of this period, the system treats the call
as specified in the following steps.)
Содержание Definity Audix System
Страница 14: ...About This Document xiv Issue 2 December 1996...
Страница 22: ...Prerequisites 1 8 Issue 2 December 1996...
Страница 96: ...Initial System Administration 3 38 Issue 2 December 1996...
Страница 170: ...Option Settings B 20 Issue 2 December 1996...
Страница 190: ...PEC Explosions C 20 Issue 2 December 1996...