4-36 Issue 9 October 1998
363-206-204
Powering, Verification, and Circuit Pack Installation
SYSCTL Switch 1 Note
:
1. For DDM-2000 OC-3 applications, switch 1 sections 1, 2 and 3 must be set to the OFF
position.
Figure 4-8. BBG8 (SYSCTL) Option Switches (Sheet 1 of 2)
Switch 1 Settings
Product Identification
Sec 1
Sec 2
Sec 3
DDM-2000/SLC-2000/
DDM-2000 FiberReach
OFF
OFF
OFF
MegaStar-2000 R1
OFF
OFF
ON
MegaStar-2000 R2
OFF
ON
ON
Component Side
Connector
Edge
OFF
2
1
S1
S1
Latch
ON
S2
8
7
6
5
4
3
S2
OFF
ON
2
1
3
Содержание DDM-2000 OC-3
Страница 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Страница 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Страница 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Страница 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Страница 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Страница 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Страница 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Страница 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Страница 143: ...363 206 204 Equipment and Rear Access Cable Installation Issue 9 October 1998 2 69 Figure 2 19 RJ 45 Plug and Face ...
Страница 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Страница 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Страница 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Страница 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Страница 362: ...8 30 Issue 9 October 1998 363 206 204 Releases 9 and 11 Installation Tests Figure 8 2 DDM 2000 User Panel ...
Страница 395: ...363 206 204 Release 13 TARP Installation Tests Issue 9 October 1998 9 29 Figure 9 2 DDM 2000 User Panel ...
Страница 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Страница 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Страница 492: ...IN 14 Issue 9 October 1998 ...