CentreVu Supervisor Version 8 Installation and Getting Started
Using CentreVu Supervisor Reports
Formatting Chart Reports
7-33
Type Tab
7
The Type tab lets you change the chart type.
The available options on the Type tab are as follows:
●
2D and 3D—changes the chart between 2-dimensional and 3-dimensional
views. 2D charts update faster than 3D charts, so if the drawing speed
seems too slow, you may want to display charts as 2D
.
●
Chart Type—specifies how the data is presented. You choose a chart type
from the list. The types of charts available vary slightly depending on
whether a 2D or 3D chart has been selected. All possible chart types are as
follows:
— Bar Chart (2D and 3D)
— Line Chart (2D and 3D)
— Area Chart (2D and 3D)
— Step Chart (2D and 3D)
Содержание CentreVu Supervisor
Страница 6: ...Introduction...
Страница 12: ...CentreVu Supervisor Version 8 Installation and Getting Started xii...
Страница 34: ...CentreVu Supervisor Version 8 Installation and Getting Started Introduction CMS System Capacities 1 16...
Страница 270: ...CentreVu Supervisor Version 8 Installation and Getting Started Overview A 8...
Страница 284: ...CentreVu Supervisor Version 8 Installation and Getting Started GL 14...
Страница 306: ......