CentreVu Supervisor Version 8 Installation and Getting Started
Using CentreVu Supervisor Reports
Selecting Report Run Dates
7-7
Selecting Report Run Dates
7
When you run historical reports, you need to select the date or dates for which
to run the report. To do this, you can do any of the following:
●
Type the date or date range in the Date(s): input field.
●
Type a relative date (for example, -2 for two days ago).
●
Select the date(s) from the history list of previously used date(s) for this
report.
●
Select the Browse button
.
— If you select the Browse button and the input needed is a single date,
the following window displays:
To select a specific date, use your mouse to point at a day and click.
The day is highlighted.
Содержание CentreVu Supervisor
Страница 6: ...Introduction...
Страница 12: ...CentreVu Supervisor Version 8 Installation and Getting Started xii...
Страница 34: ...CentreVu Supervisor Version 8 Installation and Getting Started Introduction CMS System Capacities 1 16...
Страница 270: ...CentreVu Supervisor Version 8 Installation and Getting Started Overview A 8...
Страница 284: ...CentreVu Supervisor Version 8 Installation and Getting Started GL 14...
Страница 306: ......