CentreVu Supervisor Version 8 Installation and Getting Started
Using CentreVu Supervisor Reports
Running a Report
7-4
The Report Selector window appears. An example of the Report Selector
window is shown below. The tabs in this window may vary, depending on
which option you chose under Commands or Tools.
In the Report Selector window:
3.
Select a category from the Category box.
4.
Select a report from the Report list box.
5.
Select the ACD for which you want to run the report.
6.
If you want to schedule the selected report to run at a certain time, select
the Script button.
The Script button displays the Save as Script dialog box, which lets you
create a new script for the selected report, but does not run the report. The
script type is set to interactive and cannot be changed.
7.
Select OK, or double-click on the report. The report input window
displays. The inputs required will vary, depending on which report you are
running.
8.
Go to
Содержание CentreVu Supervisor
Страница 6: ...Introduction...
Страница 12: ...CentreVu Supervisor Version 8 Installation and Getting Started xii...
Страница 34: ...CentreVu Supervisor Version 8 Installation and Getting Started Introduction CMS System Capacities 1 16...
Страница 270: ...CentreVu Supervisor Version 8 Installation and Getting Started Overview A 8...
Страница 284: ...CentreVu Supervisor Version 8 Installation and Getting Started GL 14...
Страница 306: ......