Task: viewing and changing system setup values
CentreVu CMS Administration
Loading pseudo-ACD data
10-15
...........................................................................................................................................................................
6
In the Start time field, type the time from when you want to start
migrating data to the pseudo-ACD. The default is 12:00 a.m., midnight.
The time tells
CentreVu
CMS which time to look for on the backup
volume and at which point to begin loading data to the pseudo-ACD.
...........................................................................................................................................................................
7
In the Stop date field, type the date that you want to stop migrating the
data from the backup volume to the pseudo-ACD.
This is the date on the backup volume at which you want
CentreVu
CMS to stop loading data to the pseudo-ACD. This field is required.
...........................................................................................................................................................................
8
In the Stop time field, type the time at which you want to stop migrating
data from the volume to the pseudo-ACD. The default is 11:59 p.m.
This is the time on the backup volume at which you want
CentreVu
CMS to stop loading data to the pseudo-ACD.
E
N D
O F
S T E P S
...........................................................................................................................................................................
Reference
•
The data loaded from a full backup may be more than you need
and which could create disk space problems. Determine the
amount of data and disk space needed, and do only a Specific
Tables backup.
The Load Pseudo-ACD command automatically removes existing
data and inserts new data if pseudo-ACD data already exists for
this ACD.
•
Cancel stops loading data. If you stop before data-loading
completes, partial data for this pseudo-ACD remains.
•
Data is migrated to the pseudo-ACD for the period between the
start and stop dates set in the Pseudo-ACD Data window.
•
If Forecast is enabled on the pseudo-ACD, change the values for
the forecast archive parameters as necessary.
•
Back up the data that will be loaded in the pseudo-ACD. See
“Task: maintaining
CentreVu
CMS” for more information.
Содержание CentreVu CMS Administration
Страница 1: ...585 210 910 Comcode 108501743 Issue 1 November 1999 CentreVu CMS Administration...
Страница 12: ...About this information product CentreVu CMS Administration xii...
Страница 36: ...Task startup and exit CentreVu CMS Administration Task reference CentreVu CMS training classes 1 24...
Страница 137: ...Task automating your activities with scripting CentreVu CMS Administration Using Save as Script 5 5...
Страница 148: ...Task automating your activities with scripting CentreVu CMS Administration Task reference 5 16...
Страница 280: ...Task assigning user permissions CentreVu CMS Administration Viewing assigning deleting or changing VDN access 9 28...
Страница 382: ...Task learning and using Solaris CentreVu CMS Administration Restore files in Solaris 12 12...
Страница 456: ...Index CentreVu CMS Administration IN 8...