5. INSTALLATION - GENERAL
5.1. Setting Up the Crane
Lower the crane boom to a safe and convenient position for installation of system components.
High tensile booms require proper
welding
procedure specifi
cations. Obtain special
ist
assistance in these cases.
Please r efer to the General Arrangement
drawings at the rear of the manual for an
overview of the configuration.
5.2. Angle Sensors
The telescopic crane Boom Angle Sensor is mounted on the electrical sub-plate within the recoil drum.
Factory supply (unless ordered specifically) is for RH mounting. If mounting to LHS the BAS must be
realigned. Refer next paragraph.
5.2.1.
Changing from RHS to LHS mounting
The Boom Angle Sensor (BAS) is physically mounted within the recoil set for RHS boom mounting as
standard. Should the recoil drum be mounted to the LHS of the boom, the BAS will need to be rotated to the
LHS mount position.
Undo the 2 mount screws and rotate the BAS clockwise to the alternative mount position.
Refix the 2 mount screws.
5.3. Length Sensors
5.3.1.
General
Fix the recoil drum and pay-out cable to the RHS side of the main boom (LH installations require
the electronic angle sensor to be re-positioned on its mount, (refer to the above BAS section) by
welding the mounting bracket provided.
Route the cable carefully from the recoil drum back around the boom pivot to the cab. Fix the cable
to the boom and turret using adequate fixings ensuring that the cable is not pinched or stretched as
the boom moves through its full luffing arc. Only connect the cable to the Control Unit when
finished welding.
Содержание RCI-1550 LM
Страница 2: ......
Страница 58: ...Drawings Part A System Components ...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ...APPROVED BY TOL 0 0 0 1 2 3 4 55 26 2 0 7 2 8 9 1 1 1 1 0 7 5 6 2 ...
Страница 64: ......
Страница 66: ...APPROVED BY TOL 0 0 0 1 22 3 4 5 6 0 22 2 1 7 8 98 1 7 8 98 7 8 98 7 8 98 1 0 9 8 3 6 8 3 ...
Страница 67: ... APPROVED BY 0 1 2 22 3 3 3 TOL 4 4 23 4 232 22 5 0 42 4 2 3617 8 9 8 8 2 ...
Страница 68: ... APPROVED BY 0 1 2 22 3 3 3 TOL 4 4 23 4 232 22 3 242 4 2 32 2 3516 7 8 7 7 9 2 3 42 4 2 ...
Страница 72: ......
Страница 74: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ...Drawings Part B General Arrangement and Wiring ...
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ... Appendix 4 RCI System Crane Configuration Sheet Duty Listing XQFWLRQ RGHV ...
Страница 97: ......