3. Installation Method
Install draw-out type according to the
instruction given below.
1. Securely install the cradle at the
bottom with M12 bolts (4EA).
2. Pull the extension rails of cradle
forward.
3. Put the breaker on the rail as shown
in picture by using lifting device.
4. Please check if the circuit breaker
fits well to the cradle.
5. Slowly push the circuit breaker by
moving the rail handle.
Installation of Draw-out Type
1. Do not lay down a breaker on the
side or stand with the side of it.
2. Install a circuit breaker on perfect
even ground. (Within 2mm of the
level difference)
3. Do not install a circuit breaker with
same direction of a rail when you
use an angle.
4. Install a circuit breaker at a right angle
to the direction of a rail to decentralize
weight of the circuit breaker.
Caution
Insert insulating barriers between the phases after installing of a circuit breaker for the safety. (option)
Installation of Insulation Barrier
A (Cradle rail)
B (ACB frame)
C (Cradle rail)
C
1
2
Installation and Service Condition
Содержание Metasol Series
Страница 32: ...31 D Digital Trip Relay D 3 Internal Circuit Diagram Internal Circuit Diagram ...
Страница 38: ...37 D Digital Trip Relay D Ground Fault Protection 4 Relay Function ...
Страница 39: ...38 Technical catalog for Susol Metasol ACB Technical catalog for Susol Metasol ACB D D IDMTL ...
Страница 40: ...39 D Digital Trip Relay D PT A Curve 4 Relay Function ...
Страница 136: ...K 136 138 1 Control Circuit 2 External Dimension Control Circuit and Dimension 135 ...
Страница 153: ...152 Technical catalog for Susol Metasol ACB Technical catalog for Susol Metasol ACB Memo ...
Страница 154: ...153 Technical Materials Memo ...