Chapter 6. Communication Function
6-6
(3) Entry list setting
Entry list is area to register the data RTX information.
Note
The GRL-DT4A among Smart I/O modules has input and output. So two entry list is occupied
for one module. At this time, the station no. should be same but block no. should be different.
4)
High Speed Link operation
If the setting of the High Speed Link parameter is finished, write the parameter to PLC CPU after
compiling it and enable the High Speed Link. If the above process is done, High Speed Link service
starts. High Speed Link starting sequence is as follows.
(1) Write parameter
Parameter download screen
Save the High Speed Link parameter written by the user in the project file of the GMWIN, connect with
PLC via [Connect] on the [Online] and write the Parameter or the Parameter and Program to PLC.
Содержание G0L-GWRA
Страница 115: ...Appendix A 14 A3 5 G0L GWRA Applied type G0L GWRA ...