Learning to Perform Basic Operations
3.3
Actual Application Examples
Acceleration Time Configuration (0.4-22kW models only)
The following is an example demonstrating how to modify the ACC (Acceleration time) code
value (from 5.0 to 16.0) from the Operation group.
Step
Instruction
Keypad Display
1
Ensure that the first code of the Operation group is selected,
and code 0.00 (Command Frequency) is displayed.
2
Press the [
▲
] key.
The display will change to the second code in the Operation
group, the ACC (Acceleration Time) code.
3
Press the [ENT] key.
The number ‘5.0’ will be displayed, with ‘0’ flashing. This
indicates that the current acceleration time is set to 5.0
seconds. The flashing value is ready to be modified by using
the keypad.
4
Press the [
◀
] key to change the first place value.
‘
5’ will be flashing now. This indicates the flashing value, ‘5’ is
ready to be modified.
5
Press the [
▲
] key to change the number
‘
5
’
into
‘
6
’
, the first
place value of the target number
’
16.
’
6
Press the [
◀
] key to move to the 10s, place value.
The number in the 10s position, ‘0’ in ‘06’ will start to flash
7
Press the [
▲
] key to change the number from
‘
0
’
to
‘
1
’
, to
match the 10s place value of the target number
’
16,
’
and then
press the [ENT] key.
Both digits will flash on the display.
8
Press the [ENT] key once again to save changes.
‘
ACC’ will be displayed. The change to the acceleration time
setup has been completed.
0.00
acc
5.)
%.0
^.0
)6.0
!^,)
acc
Содержание LSLV-S100 Series
Страница 1: ......
Страница 11: ...Preparing the Installation 2 ...
Страница 13: ...Preparing the Installation 4 5 5 22kW 3 Phase ...
Страница 16: ...Preparing the Installation 7 Front cover removed ...
Страница 45: ...Installing the Inverter 36 IP66 0 4 0 8kW 3 phase 1 5 2 2kW 3 phase ...
Страница 50: ...Installing the Inverter 41 0 4 22kW Standard I O Multiple I O ...
Страница 67: ...Installing the Inverter 58 ...
Страница 69: ...Learning to Perform Basic Operations 60 30 75kW Models ...
Страница 71: ...Learning to Perform Basic Operations 62 3 1 3 2 30 75kW Models Monitor mode display Parameter settings display ...
Страница 193: ...Table of Functions 184 ...
Страница 205: ...196 Troubleshooting ...
Страница 222: ...Technical Specification 213 7 3 External Dimensions 0 4 22kW Models 0 4 kW Single Phase 0 4 0 8 kW 3 Phase ...
Страница 228: ...Technical Specification 219 30 75kW Models 30 kW 3 Phase 37 45 kW 3 Phase ...
Страница 230: ...Technical Specification 221 IP66 Models 0 4 4 0kW NP Non PDS type ...
Страница 231: ...Technical Specification 222 0 4 4 0kW PDS type ...
Страница 233: ...Technical Specification 224 5 5 7 5kW NP Non PDS type ...
Страница 235: ...Technical Specification 226 11 0 22 0kW NP Non PDS type ...
Страница 259: ...250 ...
Страница 261: ...252 ...
Страница 263: ...254 ...