RS-485 Communication Features
340
7.2 Communication System Configuration
In an RS-485 communication system, the PLC or computer is the master device and the
inverter is the slave device. When using a computer as the master, the RS-232 converter
must be integrated with the computer, so that it can communicate with the inverter through
the RS-232/RS-485 converter. Specifications and performance of converters may vary
depending on the manufacturer, but the basic functions are identical. Please refer to the
converter manufacturer’s user manual for details about features and specifications.
Connect the wires and configure the communication parameters on the inverter by referring
to the following illustration of the communication system configuration.
7.2.1 Communication Line Connection
Make sure that the inverter is turned off completely, and then connect the RS-485
communication line to the S+/S-/SG terminals of the terminal block. The maximum number
of inverters you can connect is 16. For communication lines, use shielded twisted pair
(STP) cables.
The maximum length of the communication line is 1,200 meters, but it is recommended to
use no more than 700 meters of communication line to ensure stable communication.
Please use a repeater to enhance the communication speed when using a communication
line longer than 1,200 meters or when using a large number of devices. A repeater is
effective when smooth communication is not available due to noise interference.
When wiring the communication line, make sure that the SG terminals on the PLC and
inverter are connected. SG terminals prevent communication errors due to electronic noise
interference.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...