![LS ELECTRIC LSLV-H100 Series Скачать руководство пользователя страница 268](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798268.webp)
255
Learning Advanced Features
Code
Description
CNF-43 Macro
Select
A list of Macro settings is displayed for user selection. When a Macro
function is selected, all the related parameters are automatically changed
based on the inverter’s Macro settings.
If ‘0 (Basic)’ is selected, all the inverter parameters, including the
parameters controlled by the Macro function, are initialized.
For other macro application settings (settings 1
–7), refer to
5.43 Timer Settings
Set a multi-function input terminal to a timer. Sets the On/Off controls to the multi-function
outputs and relays according to the timer settings.
Group Code
Name
LCD Display
Parameter Setting Setting Range Unit
IN
65
–71
Px terminal
configuration
Px Define
(Px: P1
–P7)
35 Timer In
0-55
-
OUT
31
Multi-function
relay 1
Relay 1
22 Timer Out
0-41
-
33
Multi-function
output 1
Q1 Define
55
Timer on delay TimerOn Delay 3.00
0.00
–100.00
sec
56
Timer off delay
TimerOff Delay 1.00
0.00
–100.00
sec
Timer Setting Details
Code
Description
IN-65
–71 Px Define
Choose one of the multi-function input terminals and change it to a
timer terminal by setting it to ‘35(Timer In)’.
OUT-31 Relay 1,
OUT-36 Q1 Define
Set the multi-function output terminal or relay to be used as a timer
to ’22 (Timer out)’.
OUT-55
TimerOn Delay,
OUT-56
TimerOff Delay
Input a signal (On) to the timer terminal to operate a timer output
(Timer out) after the time set at OUT-55 has passed. When the multi-
function input terminal is off, the multi-function output or relay turns off
after the time set at OUT-56.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...