
How to Set Up and Run the FG5
3
7. Close computer lid and place computer in the system controller case.
8. Close the system controller case and secure all latches.
3.4.3.ROTATION MONITOR (IF
INCLUDED)
9. Unplug all BNC and power cables from the rotation monitor, detector box,
and electronics rack and store in the rotation monitor case.
10. Remove the rotation monitor from the dropping chamber (two M6x35
screws) and place in the rotation monitor case.
11. Close the rotation monitor case and secure all latches.
12. Replace the two M6x35 screws in the dropping chamber top flange, and
replace the viewing port cover.
13. Secure the lids to the electronics case.
3-21
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......