
How to Set Up and Run the FG5
3
3.4. Disassembling and Packing
the
FG5
NOTE:
Please follow these instructions carefully. Care in packing the
components properly will result in easier and faster set-up in the field, and will
help protect the instrument from damage.
3.4.1.ELECTRONICS
1. Disconnect the following cables from the electronics rack and components.
•
APD power cable (green)
•
TTL fringe BNC cable
•
Laser signal (umbilical) cable
•
Laser HV BNC cable
•
AC Mains power cord
•
AC computer power cord
2. If the storage/movement of the FG5 is less than about 8 hours, it is
possible to travel the dropping chamber with the ion pump supply’s
internal battery backup. Make sure the DC and HV switches are on, and
pack the ion pump controller inside the dropping chamber travel case.
3. If the storage is longer term, pack the ion pump supply inside of the
dropping chamber travel case, as above, but turn off all the power
switches.
4. Put the remaining cables in the zippered pouch which is attached to the
inside of the rear electronics case lid.
5. Secure the lids to the electronics case.
3.4.2.SYSTEM CONTROLLER
6. Unplug power cords and printer cable from the computer and place them
in the system controller case.
3-20
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......