How to Set Up and Run the FG5
3
51. Attach the rest of the system cables as described below. Both ends of all
cables are labeled with the proper location for each connector.
•
MAKE SURE THE DROPPING CHAMBER IS IN STANDBY (PRESS THE
RESET BUTTON TO FORCE THE DROPPING CHAMBER
CONTROLLER INTO STANDBY). Connect the dropping chamber signal
cable (
white
Lemo connector) from the power supply to the electrical
feedthrough on the service ring.
•
Connect the rotary shaft encoder cable (
blue
Lemo connector) from the
power supply panel to the blue Lemo connector on the motor drive
assembly.
•
Connect the DC motor power cable (
orange
Lemo connector) from the
power supply panel to the orange Lemo connector on the motor drive
assembly.
•
Connect the APD power cable (
green
Lemo connector) from the power
supply panel to the interferometer base “power” connector.
3.1.8.THE SUPERSPRING
52.
Make sure the COIL switch on the superspring controller is OFF
. Connect
the superspring control cable (
yellow
Lemo connector) from the power
supply panel to the connector on the base of the superspring.
!
DO NOT ATTACH SUPERSPRING CONTROL CABLE WHEN
THE COIL SWITCH IS ON.
53. Adjust the leveling screws on the superspring tripod, if necessary, to level the
superspring with the two precision level vials on the base.
!
CAUTION:
DO NOT ADJUST THE LEVELING VIALS
THEMSELVES. They are preset to provide the correct internal vertical reference
for the superspring.
3-11
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......