
Switching the AC Power
Appendix A
6. SWITCHING THE AC POWER
Switching between 100-115 VAC and 220-240 VAC
NOTE: Check the manuals for each component to determine the proper fuse
for the line voltage being used. Components not listed in these instructions
are configured to automatically switch between 100-115 VAC and 220-240
VAC.
6.1. LASER
6.1.1.WEO Model 100 Laser
Possible voltage selection positions (50-60Hz): 100, 115, 220, and 240 VAC
1. Remove AC power cord from the power entry module on the rear panel of
the laser controller.
2. Open the power entry module and remove drum voltage selector. IT IS
VERY IMPORTANT TO REMOVE THE DRUM - DO NOT ROTATE THE
DRUM IN PLACE. THIS CAN CAUSE DAMAGE TO THE TRANSFORMER
INSIDE THE LASER CONTROLLER.
3. Rotate the drum voltage selector until the proper line voltage is visible (make
sure the drum is removed from the power entry module).
4. Replace the drum voltage selector (making sure the proper line voltage is
visible) and plug the AC power cord into the power entry module.
6-1
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......