Operating instructions
ScanAfia X TK, S, ICU Version 1.5
Copyright © Lojer Oy, 2015
5
3
Acceptance inspection and storage
Check that the transportation package is intact and no damages have occurred
during transport. Remove all the packaging material of the bed. Remove also
all possible transportation brackets.
The delivery must include all the components included in the shipping list. If
defects in the shipment are discovered, contact the supplier immediately.
IMPORTANT!
The allowed storage temperature of the bed is between -20
and +50 °C and the allowed humidity of the storage room is
between 30 and 75%.
IMPORTANT!
To use the battery system of a bed equipped with one, the
battery must be charged for at least 14 hours after storage or
before it is first commissioned.
IMPORTANT!
After long-term storage, the battery may need to be charged
and discharged several times to reach its peak performance.
IMPORTANT!
The battery is discharged within a few months of storage.
Always charge the battery fully before storage of longer than
six months. You must charge the battery fully once every 12
months.