background image

8

Modbus Instructions

Input Registers

Address

Description

Default

Unit

Min.

Max.

Resolution

30001

Discrete Inputs 1 - 16

0

NA

0

65535

1

30002

Discrete Inputs 17 - 32

0

NA

0

65535

1

30003

Discrete Inputs 33 - 48

0

NA

0

65535

1

30004

System / Cascade Setpoint

0

Degrees Celsius

0

130

0,5

30006

Cascade Total Power

0

%

100

800

1

30007

Cascade Current Power

0

%

0

800

1

30008

Outlet Setpoint 1

0

Degrees Celsius

0

130

0,5

30009

Outlet Temperature 1

0

Degrees Celsius

0

130

0,1

30010

Inlet Temperature 1

0

Degrees Celsius

-20

130

0,1

30011

Flue Temperature 1

0

Degrees Celsius

-20

130

0,1

30012

Firing Rate 1

0

%

0

100

1

30014

Boiler 1 Status Code

0

NA

0

65535

1

30015

Boiler 1 Blocking Code

0

NA

0

65535

1

30016

Boiler 1 Lockout Code

0

NA

0

65535

1

30017

Outlet Setpoint 2

0

Degrees Celsius

0

130

0,5

30018

Outlet Temperature 2

0

Degrees Celsius

0

130

0,1

30019

Inlet Temperature 2

0

Degrees Celsius

-20

130

0,1

30020

Flue Temperature 2

0

Degrees Celsius

-20

130

0,1

30021

Firing Rate 2

0

%

0

100

1

30023

Boiler 2 Status Code

0

NA

0

65535

1

30024

Boiler 2 Blocking Code

0

NA

0

65535

1

30025

Boiler 2 Lockout Code

0

NA

0

65535

1

Holding Registers

40001

Configuration

0

NA

0

65535

1

40002

Coils

0

NA

0

65535

1

40003

0-10 Volt Input / Rate Command /
Setpoint Command

0

%

0

100

1

40004

Tank Setpoint

0

Degrees Celsius

0

87,5

0,5

40005

Tank Temperature

0

Degrees Celsius

-20

130

0,1

40006

Outdoor Temperature

0

Degrees Celsius

-40

60

0,1

40007

System Supply Temperature

0

Degrees Celsius

-20

130

0,1

SYNC Boiler Memory Map

3  

Memory Map 

Configuration Bits

Address 40001 contains configuration bits sent from the BAS to the boiler.  These bits tell the boiler to use its own internal inputs,
or inputs from the BAS.  When a bit is set to 1, the boiler will ignore the corresponding value contained internally, and expect the
BAS to write that value into the Holding Registers.  The configuration bits are as follows:

Bit 4:  System Supply Temperature
Bit 5:  Outdoor Temperature
Bit 6:  Tank Temperature
Bit 7:  System Return Temperature
Bit 8 - 15:  Not Used (Default = 0)

Bit 0 (LSB):  Boiler Enable
Bit 1:  Tank Thermostat
Bit 2:  Rate Command / 10 - 10V Input / Setpoint Command
Bit 3:  Tank Setpoint

Содержание SYNC SB 1000

Страница 1: ...ing this manual the Installation and Operation Manual and the Service Manual before installing Perform steps in the order given Failure to comply could result in severe personal injury death or substa...

Страница 2: ...13 5 UNIT OPERATION Unit Operation with Modbus Communications 14 17 6 TROUBLESHOOTING 18 19 7 DIAGRAMS Ladder Diagram Part 1 2 20 21 Wiring Diagram 22 Revision Notes Back Cover Abbreviation or Acronym...

Страница 3: ...128 Any dip switch set to 0 has a value equal to 0 Example To set the address of the Modbus board to 50 dip switches 2 5 and 6 have to be set to the 1 position The address is determined by adding the...

Страница 4: ...based on its own inputs Parity Parity is set by the position of Dip switch 10 0 No Parity 1 Odd Parity If No Parity is selected there will be two stop bits otherwise there will be one Data Transmissi...

Страница 5: ...r Counters and Diagnostic Registers 11 0B Diagnostic Return Bus Message Count 12 0C Diagnostic Bus Communication Error Count 13 0D Diagnostic Bus Exception Error Count 14 0E Diagnostic Return Slave Me...

Страница 6: ...expectation of the application program since the MODBUS protocol is unaware of the significance of any particular value of any particular register 04 SLAVE DEVICE FAILURE An unrecoverable error occurr...

Страница 7: ...10007 Auto Reset High Limit 1 0 1 ON 0 OFF 0 1 1 10008 Flame 1 0 1 ON 0 OFF 0 1 1 10009 Enable Room Thermostat 1 Stage 1 0 1 ON 0 OFF 0 1 1 10010 Tank Thermostat 0 1 ON 0 OFF 0 1 1 10017 Manual Reset...

Страница 8: ...2 0 0 100 1 30023 Boiler 2 Status Code 0 NA 0 65535 1 30024 Boiler 2 Blocking Code 0 NA 0 65535 1 30025 Boiler 2 Lockout Code 0 NA 0 65535 1 Holding Registers 40001 Configuration 0 NA 0 65535 1 40002...

Страница 9: ...ther of these temperatures is provided by the BAS but any of the other control signals are being provided the BAS will still need to refresh these inputs at least every 4 minutes Physical Wiring Figur...

Страница 10: ...2 INLET TEMPERATURE SENSOR HEAT EXCHANGER 1 HEAT EXCHANGER 2 OUTLET TEMPERATURE SENSOR HEAT EXCHANGER 1 HEAT EXCHANGER 2 FLUE GAS SENSOR HEAT EXCHANGER 1 HEAT EXCHANGER 2 HIGH LIMIT SENSOR FLAME SENS...

Страница 11: ...MARY CONTROL MODULE ALARM BELL RUN TIME CONTACTS SEQUENCER BUILDING MANAGEMENT SYSTEM HEAT EXCHANGER 1 HEAT EXCHANGER 2 BOILER PUMP SYSTEM PUMP HW PUMP IGNITOR BLOWER GAS VALVE PC INTERFACE SECONDARY...

Страница 12: ...US COMMUNICATION BOARD MTR01 HEAT EXCHANGER 1 HEAT EXCHANGER 2 Modbus Instructions Typical Boiler System Wiring Cascade Daisy Chain Connection Modbus RS485 Communication Bus Modbus RS485 Port on Gatew...

Страница 13: ...us RS485 Port on Gateway or Building System Physical Configuration Direct Control Cascade Daisy Chain Connection Modbus RS485 Communication Bus Modbus RS485 Port on Gateway or Building System Physical...

Страница 14: ...ll provide for fail safe operation should Modbus communication be lost This timer will cause the unit to revert back to internal unit controls should the Modbus communication be interrupted longer tha...

Страница 15: ...l and DHW with remote control DHW with direct control This is the typical installation with a hot water generator in close proximity to the boiler with the tank thermostat or tank temperature sensor w...

Страница 16: ...values are only available through the Modbus communication bus To ensure that the SYNC boiler can properly respond to a call for hot water generation the following holding registers must be set in add...

Страница 17: ...d setpoint the hexadecimal value must be determined through linear interpolation of programmable parameters on the BMS Setup Menu BMS temperature set point at low analog input BMS temperature set poin...

Страница 18: ...utlet temperature 3 Heat Demand blocked due to high absolute flue temperature 4 Heat Demand blocked due to high absolute Delta T Outlet Inlet 8 Heat Demand blocked due to Low 24 VAC 9 Outdoor shutdown...

Страница 19: ...36 EEPROM code APS active not Open 237 EEPROM code flame out of sequence 239 EEPROM code when gas valve relay test fails 240 EEPROM code MRHL 32767 Code not present Modbus Instructions Installation Re...

Страница 20: ...FLAME ROD SPARK ROD CAUTION HIGH VOLTAGE SPARK LEAD BLOWER X2 2 FLAP VALVE AIR PRESSURE SWITCH FLAP VALVE X5 7 24V X5 7 24V X5 4 X5 4 INLET SENSOR INLET SENSOR OUTLET SENSOR FLUE SENSOR OUTLET SENSOR...

Страница 21: ...SYSTEM PUMP RELAY HEX 1 BOILER PUMP CONTACTS HEX 2 BOILER PUMP CONTACTS SYSTEM PUMP CONTACTS L1 N L2 120 VAC 24 VAC ON OFF SWITCH X1 6 BOILER PUMP RELAY DHW PUMP RELAY SYSTEM PUMP RELAY BLOWER RELAY X...

Страница 22: ...1 12 CN1 15 CN1 16 CN1 8 CN1 7 CONNECTION BOARD JUNCTION BOX RELAY BOARD K1 K2 K3 X8 MOD BUS KIT X4 X6 6 X6 1 LOW WATER CUTOFF BOARD J3 1 J3 2 J3 3 J3 4 J3 5 J3 6 J2 1 J2 2 J2 3 X6 2 X6 9 X6 10 BLOWER...

Страница 23: ...23 Notes...

Страница 24: ...Revision Notes Revision A ECO C04560 initial release SYNC MODB Rev A 10 09...

Отзывы: