background image

 

 

3.0

 

TECHNICAL DATA 

 

Model Number 

SST66 

SST110 

SST165 

SST220 

GENERAL DATA 
Shipping Weight  

kg 

55 

95 

140 

175 

Full Weight  

kg 

355 

595 

840 

1175 

Immersion Boss  

BSP 

1x 2

¼"

 

1x 2¼" 

1x 2¼" 

1x 2¼" 

WATER DATA 
Water Content  

Litre 

300 

500 

700 

1000 

Max. Water Pressure  

bar 

 

3.1.1

 

TECHNICAL SPECIFICATIONS 

 

4.0

 

GENERAL REQUIREMENTS 

 
The  Lochinvar  SST  direct  storage  vessel  has  been  designed  to  operate  trouble  free  for  many  years.  
These  instructions  should  be  followed  closely  to  obtain  the  maximum  usage  and  efficiency  of  the 
equipment. PLEASE read the instructions fully before installing or using the appliance. 
 

4.1

 

RELATED DOCUMENTS 

 
The  installation  should  follow  the  relevant  guidance  offered  in  the  following  documents.    It  is  not 
practical to list all relevant information but emphasis is placed on the following documents, as failure 
to comply with the guidance given will almost certainly result in an unsatisfactory installation: 
 
BS 6700: 1997 

Design, installation, testing and maintenance of services supplying water for 
domestic use within buildings and their curtilages 

 
BS 7074: 1989 

Application,  selection  and  installation  of  expansion  vessels  and  ancillary 
equipment for Parts 1and 2 sealed systems 

 
BS 7671: 2008 

Requirements  for  electrical  installations,  I.E.E.  wiring  regulations 
seventeenth edition 

 
CP 342:   

 

Code  of  practice  for  centralised  hot  water  supply-buildings  other  than 

dwellings 
Part 2 1974 
 

5.0

 

WATER QUALITY 

 
Water supply quality may adversely affect the efficiency and performance of water heaters and hot 
water systems.  The situation can intensify where higher temperatures or demands exist. 
 
Water hardness should not exceed 205ppm CaCO3 and TDS (Total Dissolved Solids) of untreated water 
should  not  exceed  350ppm.    If  these  values  are  exceeded,  contact  Lochinvar  Limited  for  further 
guidance. 
 
Also  Water  hardness  requirements  stated  in  the  Installation  Commissioning  and  Maintenance 
Instructions provided with the primary heat source (if not used as an electric storage vessel only) must 
be taken into account, these requirements override the guidance given in this manual. 
 

 

Содержание SST Series

Страница 1: ...Models SST66 SST110 SST165 SST220 Installation manual_SST_JANUARY 2019 SST DIRECT STORAGE VESSEL Installation Commissioning Maintenance and User instructions...

Страница 2: ...1...

Страница 3: ...MMENDED PIPEWORK FOR A CONDENSING CIRCULATING APPLIANCE 8 6 3 2 RECOMMENDED PIPEWORK FOR A STORAGE APPLIANCE 8 6 3 3 TEMPERATURE AND PRESSURE RELIEF VALVE 9 6 3 4 RELIEF VALVE DISCHARGE PIPEWORK 9 6 3...

Страница 4: ...g stage All installations must conform to the relevant Building Regulations Health Safety requirements must also be taken into account when installing any equipment Failure to comply with the above ma...

Страница 5: ...symbol added to a yellow triangle with black edges indicates danger ACTION REQUIRED A white symbol inserted in a blue circle indicates an action that must be taken to avoid risk READ AND UNDERSTAND TH...

Страница 6: ...750 2055 1550 1030 530 445 410 375 290 SST220 1000 1907 1080 1536 1221 906 591 506 471 436 351 2 2 1 CONNECTION HEIGHTS AND DIMENSIONS No Description Size BSP Model reference 1 Spare 1 All 2 Hot Outle...

Страница 7: ...ign installation testing and maintenance of services supplying water for domestic use within buildings and their curtilages BS 7074 1989 Application selection and installation of expansion vessels and...

Страница 8: ...e appliances please contact Lochinvar Limited 6 2 1 RECOMMENDED PIPEWORK FOR A CONDENSING CIRCULATING APPLIANCE 6 2 2 RECOMMENDED PIPEWORK FOR A STORAGE APPLIANCE BUILDING RETURN BUILDING FLOW IV STOR...

Страница 9: ...and must comply with The Building Regulations Part G3 in England and Wales P5 in Northern Ireland and P3 in Scotland A kit of components that have been suitably sized for the unvented or boosted oper...

Страница 10: ...d maintenance of services supplying water for domestic use within buildings and their curtilages b Have a vertical section of pipe at least 300mm long below the tundish before any elbows or bends in t...

Страница 11: ...TAL DISCHARGE PIPE D1 FROM TEMPERATURE RELIEF VALVE TO TUNDISH SAFETY DEVICE e g TEMPERATURE RELIEF VALVE DISCHARGE PIPE D2 FROM TUNDISH WITH CONTINUOUS FALL FIXED GRATING TRAPPED GULLY DISCHARGE IDEA...

Страница 12: ...d at a consistent temperature throughout By achieving a uniformed stored water temperature of at least 60 C the risk of any bacterial contamination is virtually eliminated If the SST is to be installe...

Страница 13: ...ouble free operation Even if a maintenance schedule is determined to be less than annually it is important that all controls and safety features are checked for correct operation on an annual basis 8...

Страница 14: ...r fixture to allow air to escape 3 Open the cold water supply to water heater and allow the vessel to fill 4 Check for water leakage 8 6OTHER CHECKS 8 6 1 RELIEF VALVE At least once a year the tempera...

Страница 15: ...the water may sometimes appear milky This is due to very tiny air bubbles in the water which will clear very quickly Warning If cold warm water exits from the temperature and pressure relief valve TP...

Страница 16: ...15...

Отзывы: