background image

1 (10)

Function

When the ground sensor detects moisture while 

the ground temperature is so low that there is a 

freezing hazard, the control unit starts snow melt-

ing via the external control equipment. When the 

ground sensor is dry, the snow melting is shut 

off. The unit can be programmed to maintain the 

heating activated for the desired time even if the 

ground sensor is dry. 

1.  Install the control unit indoors either direct-

ly on the wall or on the DIN rail. 

2.  Start/stop signal to the property's BMS 

is drawn from the pump inlet in the LK 

Control unit ETO2 terminals 3, 4. (NOTE! 

Potential-free contact).

3.  Connect the LK Ground sensor ETOG ac-

cording to the instruction under the head-

ing 

LK Ground sensor ETOG

.

4.  Pump and actuator are not connected to the  

LK Control unit ETO2 in this case. 

5.  Connect the power supply, see the circuit 

diagram.

6.  Adjust the control unit, see the heading 

Adjustment to start/stop of external control 
equipment.

Design

LK Control Unit ETO2 is meant to be used pri-

marily as LK Snow melting must be controlled in-

termittently. The equipment consists of LK Con-

trol Unit ETO2, LK Ground sensor ETOG and LK 

Pipe sensor ETF.

LK Control Unit ETO2 offers the following:

• Energy-efficient control of the snow melting 

system.

• Simple menu navigation.
• Clear background-lit display.
• Alarm relay.

Note!

The control unit can, depending on how it is set, 

either maintain/regulate the flow temperature to 

the snow melting system or only generate start/

stop signals to the external control equipment. 

The instruction is divided into two different chap-

ters depending on the function desired. If the unit 

should maintain/regulate the flow temperature, 

follow the instructions 

Assembly instruction, 

Maintaining the flow temperature

. If the unit 

should send start/stop signals to external control 

equipment, follow the instructions below.

Assembly instruction, start/stop of 

external control equipment (BMS) 

The following instruction is applicable when 

 

LK Control unit ETO2 must send start/stop sig-

nals to the external control equipment. The con-

trol unit and sensor must only be installed by an 

authorized electrician. 

LK Control Unit ETO2

EN.31.C.5.1907

Assembly instructions | LK Control Unit ETO2

Содержание ETO2

Страница 1: ...ly as LK Snow melting must be controlled in termittently The equipment consists of LK Con trol Unit ETO2 LK Ground sensor ETOG and LK Pipe sensor ETF LK Control Unit ETO2 offers the following Energy efficient control of the snow melting system Simple menu navigation Clear background lit display Alarm relay Note The control unit can depending on how it is set either maintain regulate the flow tempe...

Страница 2: ...nfirm by pressing the MF button 4 Set Outdoor sensor to OFF confirm by pressing the MF button 5 Set Application to Water based confirm by pressing the MF button 6 The unit changes to normal view and the Adjustment to start stop of external control equipment First time the control unit is charged it must be adjusted to the snow melting system The adjust ment is done with the unit s multifunction bu...

Страница 3: ...peration 7 Check that MY Water is set to 5 degrees see the heading Settings 8 Before the system is started the maximum temperature value must be controlled see the heading Settings MAX WATER Read more about sensor 2 under the heading Ground sensor Principle drawing control via 3 way valve ...

Страница 4: ... Ground sensor ETOG to the control unit but in some cases two ground sensors may be required to achieve a satisfactory function for example a ground area that stretches around the building and thereby extends to both North and South locations Placement in the ground 1 LK Ground sensor ETOG must be placed in the ground within the heated area where snow ice is suspected to remain for the longest dur...

Страница 5: ... this Terminal number LK Pipe sensor return 29 Electrical conductor any color 30 Electrical conductor any color The sensor has no polarity Calibration of the ground sensor If necessary the temperature value for the ground sensor can be calibrated according to the instruc tions below 1 Disconnect the sensor cables that are con nected to terminals 11 and 12 Feed to heat element 2 Wait for a few hour...

Страница 6: ...mote control of forced start is connected between terminals 35 and 36 FORCED CONTROL HEAT ETO2 Remote control forced standby Forced Standby is used when you don t want the unit to start even if there is a need On activated input closed contact a forced standby is activat ed The function is connected between terminals 33 and 34 Actuator LK Control unit ETO2 sends control signals to impact the 0 10 ...

Страница 7: ...ated for zone 1 OFF Heating deactivated for zone 1 ZONE 2 ON Heating activated for zone 2 OFF Heating deactivated for zone 2 SENSOR 1 Shows the ground temperature for ground sensor 1 Note Does not show the air temperature SENSOR 2 Shows the ground temperature for ground sensor 1 Note Does not show the air temperature MOIST 1 Moisture status for sensor 1 YES NO or blank value Blank value is display...

Страница 8: ... up to the adjusted SET TEMP 1 or OFF OFF no limit SET TEMP 2 Lowest start temperature for ground sensor 2 Select between 20 up to the adjusted SET TEMP 2 or OFF OFF no limit OFFSET T1 Used to calibrate ground sensor 1 see Calibration heading Select between 5 to 5 ºC OFFSET T2 Used to calibrate ground sensor 2 see Calibration heading Select between 5 to 5 ºC OFFSET OUT The function is not used for...

Страница 9: ...tion RETURN TEMP LOW Too low return temperature SUPPLY TEMP HIGH Too high flow temperature RETURN SENSOR Defect return sensor SUPPLY SENSOR Defect supply sensor TEMP SENSOR 1 Defect ground sensor 1 TEMP SENSOR 2 Defect ground sensor 2 OUTDOOR SENSOR Defect outdoor sensor SENSOR HEATER Short circuiting of the heating element in the ground sensor FROST PROTECT Frost protection activated due to retur...

Страница 10: ...LK Pipe sensor supply Brown cable 29 LK Pipe sensor return Blue cable NOTE LK Pipe sensor 2 is connected only if needed see the head ing LK Pipe sensor ETF 30 LK Pipe sensor return Brown cable NOTE LK Pipe sensor 2 is connected only if needed see the head ing LK Pipe sensor ETF 31 32 Not used 33 34 GSM switch or other remote control Remote standby closed contact switches of snow melting in ad vanc...