background image

INTRODUCTION

GB

This instruction sheet provides you with the information required 
to safely own and operate your Little Giant product. Retain these 
instructions for future reference.
The Little Giant product you have purchased is of the highest 
quality workmanship and material, and has been engineered 
to give you long and reliable service. Little Giant products are 
carefully tested, inspected, and packaged to ensure safe delivery 
and operation. Please examine your unit carefully to ensure that 
no damage occurred during shipment. If damage has occurred, 
please contact the place of purchase. They will assist you in 
replacement or repair, if required.

READ THESE INSTRUCTIONS CAREFULLY BEFORE 
ATTEMPTING TO INSTALL, OPERATE, OR SERVICE 
YOUR LITTLE GIANT PRODUCT. KNOW THE PRODUCT’S 
APPLICATION, LIMITATIONS, AND POTENTIAL HAZARDS. 
PROTECT YOURSELF AND OTHERS BY OBSERVING ALL 
SAFETY INFORMATION. FAILURE TO COMPLY WITH THESE 
INSTRUCTIONS COULD RESULT IN PERSONAL INJURY AND/
OR PROPERTY DAMAGE!

 

      

PRE-PACKAGED UNIT

Verify all parts with basin and cover assemblies are received intact (Figure 1). 
The selected discharge and vent size will determine which flanges to use. 
The flanges provided will allow the following vent/discharge combinations 
to be used: 

2" discharge/3" vent
3" discharge/2" vent
2" discharge/2" vent
3" discharge/3" vent




9S-SMPXC-LG

10S-SMPXC-LG

(OPTIONAL)

Figure 1.
Pre-Packaged

Figure 2.
Pre-Assembled

Little Giant

P. O. Box 12010

Oklahoma City, OK 73157-2010

405.947.2511 • Fax: 405.947.8720

www.LittleGiantPump.com

[email protected]

 1

NOTE:

 The cover has three pre-fabricated holes, one to fit the 2-hole cord 

grommet, one to fit the 2" flange, and one to fit the 3" flange or 3" to 2" 
reducer flange (Figure 3). Remove proper flanges from the hardware kit to 
accommodate the vent/discharge combination used.
  1.  Remove bolts and washers in cover and set aside.
  2.  Remove gasket material from hardware kit and place material around 

circumference of basin inside of bolt circle.

  3.  Install the discharge pipe in the discharge of the pump.
  4.  Install float switch 9" from bottom of basin with a 3-1/2" tether length. Float 

switch should be installed in a manner that will not allow it to contact the 
pump or side of basin during operation. Refer to float switch instruction 
manual for alternative settings. Place the pump in the basin.

  5.  Install the adapt-a-flex flange that fits the discharge on the underside 

of the cover. Lube the adapt-a-flex flange and discharge pipe with 
petroleum jelly or other type of lubricant. Route the power cord and float 
switch cord through the smallest hole before installing cover. Slide the 
cover with the adapt-a-flex flange in place over the discharge pipe.

  6. Install the cord grommet by placing the power cord and float switch 

cord in the grommet openings. Then push the grommet into the smallest 
hole in the cover.

  7.  Install an adapt-a-flex flange in the remaining hole that corresponds to 

the vent pipe size used. Lubricate the flange and vent pipe and press 
the vent pipe into the flange 2 to 3 inches.

PRE-ASSEMBLED UNIT

The pre-assembled unit (Figure 2) is furnished fully assembled and ready 
for installation. Remove check valve from discharge pipe and re-install as 
shown on typical installation (Figure 3). 

CAUTION:

 For best performance of 

check valves when handling solids, install in a horizontal position or at an 
angle of not more than 45°. Do not install check valve in a vertical position 
as solids may settle in valve and prevent opening on start-up. Remove the 
cord from the vent hole and install the vent pipe in the hole with the adapt-
a-flex flange. (See Figure 3 to complete typical installation.)
To test the unit, plug the unit in and run water into the basin until the unit 
switches on. If the unit does not operate, refer to the troubleshooting 
information in the instructions for the pump.

Отзывы: