background image

Installation & Parts Manual

LectroCount

®

 Remote Display

Installation:  EM100-13

Содержание LectroCount

Страница 1: ...Installation Parts Manual LectroCount Remote Display Installation EM100 13 ...

Страница 2: ... use with LectroCount LCR LectroCount3 Wiring Diagrams 9 10 LectroCount LCR II 9 Select Switch Kit 9 LectroCount LCR 10 LectroCount3 10 Dual Display Kit 11 Illustrated Parts Breakdown 12 Publication Updates and Translations The most current English versions of all Liquid Controls publications are available on our website www lcmeter com It is the responsibility of the Local Distributor to provide ...

Страница 3: ...ft Wiring Connections from the LectroCount register to the LectroCount Remote Display should be made using 22 gage 4 wire shielded cable or larger Thirty feet of cable is provided with the display The maximum length of cable allowable is 100 ft The 4 wire cable includes conductors for power ground and two signals SPECIFICATIONS Environmental Design for Class I Div 2 Group C D NEMA4X Operating Temp...

Страница 4: ...is 100 feet The LectroCount Remote Display is supplied ready for final cable termination Should it be necessary to replace the cable between the signal source and the remote display be sure to secure the cable and tighten the cover so as to maintain the vapor seal Remote Display Label The LectroCount Remote Display is shipped with the units of measure displayed on the label in Gallons The applicat...

Страница 5: ...mounting location which will position the display as close to the optimal viewing angle as possible see Page 6 The diagram below shows the overall dimensions and the locations of the mounting holes on the LectroCount Remote Display Installation NOTE Dimensions shown are not for construction use Consult factory when certified Engineering Drawings are required Figure 4 Remote Display Dimensions ...

Страница 6: ...rpendicular by a specified amount The Liquid Controls LectroCount Remote Display is designed with a bias set Optimum Viewing Angle to accommodate as wide a viewing area as possible Optimum viewing with the greatest contrast will occur when the display is viewed between 20º above and 40º below horizontal If the display is viewed outside this range the display contrast will reduce to a point where i...

Страница 7: ...J1 or J2 There are 14 bolts on the rear panel of the Remote Display which need to be removed to gain access to the printed circuit board PCB When work on the internal components is complete the bolts need to be tightened to the proper torque specification and in the proper sequence to ensure that the unit is resealed properly to prevent moisture from entering Insert each bolt and tighten by hand t...

Страница 8: ...located on the bottom left side of the PCB to the left of the J2 connector Figure 9 Once the enclosure is opened the jumpers may be moved to configure the display according to the LectroCount Electronic Register for which it is designed See the table below for jumper settings NOTE The jumpers need to be in position Do not remove and discard them If Whole Units is desired then J3 and J4 must BOTH h...

Страница 9: ... various displays available from a remote location The switch kit accessory does not connect to the LectroCount Remote Display it is wired directly into the LectroCount LCR II The Select Switch Kit includes the following Push Button cord grip Cord Grip 2 4 port Conduit Box 30 Foot 2 wire Shielded Cable The 4 port Conduit Box can be configured as desired Each port is the same size so the plugs and ...

Страница 10: ...t switch is required for operation Model No E1611 For use with LectroCount LCR Once the display is mounted the cable should be routed to the LCR Choose an unused port on the LCR and connect the cord grip provided Route the cable through the cord grip and connect the cable to the J12 Connector on the LCR PCB as shown in Figure 12 J12 J1 Pin 39 Pin 21 WHITE Pin 40 Pin 22 GREEN Pin 41 Pin 23 BLACK Pi...

Страница 11: ...3 Remove the cord grip and cable from the unit 4 Install the 4 Port Junction Box in the space where the cord grip was just removed Figure 14 Dual Display Kit 2 Remote Displays with 1 LectroCount Electronic Register 5 Route the cable from the unopened Remote Display through a cord grip attached to the junction box 6 Route the removed cable through a second cord grip in the junction box 7 Connect bo...

Страница 12: ... Unit of IDEX Corporation 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com 2007 Liquid Controls Pub No 500316 07 20 07 Illustrated Parts Breakdown ...

Отзывы: