29
PoWer InsTallaTIon
Power Installation overview
When you have made all of the data connections and finished installing all of the components, connect the power to
the LCR-II and the Epson printer. But before making the power connections, go through the vehicle system checklist
below, and ensure that the electrical system of the truck meets the minimum requirements for powering the LCR-II
and the Epson printer.
vehicle system Checklist
□ Clean any corrosion from the battery terminals and battery cable to guarantee a solid, tight connection.
□ Charge the battery in accordance with the manufacturer’s specifications.
□ Ensure the alternator is large enough to meet the total demands of the truck, including the LCR-II. The LCR-II
requires a minimum of 5 A for proper operation. Run the truck at low idle with all accessories on (including
hose reel), and check the voltage with a multi-meter. The voltage should not drop below 11 V.
□ Inspect the electrical equipment on the vehicle, and ensure it is properly installed and operating correctly.
□ Determine whether the vehicle is grounded positively or negatively. Consult Liquid Controls if the vehicle
has a positive ground.
□ Make sure that any radio antennas are installed in accordance with the manufacturer’s specification to
prevent RF interference.
Содержание LectroCount LCR-II E3655 Series
Страница 6: ...6 Dimensions Side Front Top 15 9 94 5 19 LectroCount LCR II 13 7 5 8 04 10 5 70 Rear...
Страница 11: ......