PoWer InsTallaTIon 

Connect the Power

All LCR 600 shipments typically include a 40' gray power cable (100', and 300' are also available) and a 5 A fuse. 

40’ Gray PoWer Cable 

The gray power cable (PN 84046) is prewired to the J8 and J9 terminals on the display CPU board and the J6 

terminal on the CPU board at the factory. It includes two 16AWG wires and a ground drain wire. The 5 A fuse should 

be spliced into the red 16 AWG wire as close to the power source as possible. 

ePson PrInTer PoWer

Power must be supplied to the Epson printer as well. A 15' cable with a 12/24 VDC converter (825001) for printer 

power supply is also available. The red wire of this cable must be spliced into the red wire of the gray power cable on 

the LCR 600 side of the 5 A fuse.

1.  Route the gray power cable to the accessory panel. 

See 

page 17

2.  Splice the red wire from the printer power cable into the 

red wire of the gray power cable.

3.   Splice the 5 A fuse into the red wire. Make the splice 

close to the direct power terminal connection in the 

accessory panel and on the power side of the splice 

made with the printer power cable.

Power Check

After the LCR 600 has been installed, check to make sure that it powers up correctly. The LCR 600 display and the 

printer power light should come on when the truck’s ignition is turned to the ON or to the ACC position. Make sure the 

printer power switch is on. If the LCR 600 or the printer does not power up, check the wiring and the connections on 

the LCR 600 CPU board against the manual. 

4.  Connect the red wire to the direct power supply terminal 

in the accessory panel.

5.  Connect the black wire of the gray power cable to a 

reliable DC ground.

6.  Connect the black wire of the printer power to a reliable 

DC  ground.

7.  Tape the green drain wire of the gray power cable back 

against the power cable.

To connect power to the lCr 600 and the epson printer:

Page 17 describes the best practices for routing the gray power cable to the truck cab’s accessory panel. 

PoWer InsTallaTIon 

 Gray Power Cable

(see below)

Black Data Cable 

In-Line Fuse

Black

Red

Red

Battery or

Accessory Panel

Chassis or Reliable Ground

DC Ground 

Power

Supply

epson Printer Power Connections

lectroCount lCr 600 Power Connections

LCR-600 CPU Board

LCR-600 Display Board

POWER  J6

PO
WER  J8

PO
WER  J9

 Gray Power 

Cable 40’ (84046)

EARTH/

Shield 

(13)

GND/

Black 

(12)

+12-24

/Red 

(11)

In-Line Fuse

Open 

Drain

Battery or

Accessory Panel

GROUND

DC

Power

Supply

Power

Supply

+12-24

GND

+12-24

GND

EAR

TH

11

10

1213

11
10

12

13

11
10

12

13

Содержание LectroCount LCR 600 E3708 Series

Страница 1: ...LectroCount LCR 600 Installation Parts Liquid Controls An IDEX Energy Fuels Business Installation EM150 12 E3708 E3709 Series S3 ...

Страница 2: ...s Class 2 power supply or an isolation power source and overcurrent protective device rated 5 Amp max are required to be installed in the field Pour être conforme aux exigences UL une alimentation électrique de classe 2 ou une alimentation électrique isolée et comportant un dispositif de protection contre la surtension de 5 ampères ou moins sont requises pour l installation Peripheral equipment mu...

Страница 3: ...ions LectroCount housings directly mounted to the meter are attached to the earth ground through the meter via the tank and the tank piping which is grounded by the electrical system grounding rods Division 1 fixed installations typically require metal conduit to the conduit hubs for the wiring The metal conduit provides the necessary ESD protection Divison 2 installations can ground the LectroCou...

Страница 4: ... Class I Potentially Explosive Gas Vapor Atmospheres Division 2 Gases and vapor are not normally present in an explosive concentration but may accidentally exist during abnormal operations Groups C D Flammable explosive Gas groups T6 Temperature class for surface temperature limitations T6 is 85º C 40 C Tamb 70 C Safe limits of ambient temperature IP66 and NEMA 4 Ingress protection dust tight and ...

Страница 5: ...fer product delivery and ticket generation Metrological data collection Presetting by volume Multiple production selection Four delivery screens Security settings Air and vapor elimination with proper accessories Valve control with proper accessories Electronic temperature volume compensation ETVC with proper accessories POS Upgrade Functions Cash and volume discounting Multiple tax structures Pri...

Страница 6: ... and a 9 pin connector for your PC can also make the connection but requires opening the LCR 600 Installation Overview Installation Overview If the LectroCount LCR 600 was ordered as part of a meter system it will arrive mounted on the meter and prewired to the ETVC probe air eliminator and valve Installation overview for LCR 600 ordered with meter system 1 Ground truck seat cushion Page 12 2 Inst...

Страница 7: ...ers should penetrate any paint to ensure a good electrical connection Ensure a Good Ground 6 1 2 3 3 5 8 4 9 LectroCount Ground Strap Kit 82185 Install the LectroCount Ground Strap Kit before installing the LectroCount register ESD Precaution Some truck seats typically passenger seats are not adjustable and do not require grounding Grounded Passenger Seats Typical Adjustable Truck Seats Ground Che...

Страница 8: ...ep until the product stops draining from the differential valve and discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close the manual valve in the supply line on the inlet side of the meter If no manual valve exists on the inlet side consult the truck manufact...

Страница 9: ...tions the cables must be routed from the back of the truck where the LCR 600 is installed to the front of the truck where the accessory panel is and the printer is typically installed The black data cable connects to the printer typically mounted in the truck cab The gray power cable hooks up to a power source During installation follow these guidelines and ensure the cables remain undamaged Guide...

Страница 10: ... 11 Solenoid Operated Block Valve A2859 11 Block Valve and 3 Way Solenoid PN 81527 Single Stage Systems Liquid Controls Valves Overview When ordered as part of a meter system with a LCR 600 Liquid Control s control valves are bolted onto the meter and wired to the LCR 600 at the factory Electronic control valves can also be ordered separately and retrofit onto meter systems already in service Thes...

Страница 11: ...nd close a V 7 valve These valves are typically used in high viscosity applications like lube oil E 7 Valve A2859 11 Solenoid Operated Block Valve and 3 Way Solenoid PN 81527 A2848 11 Solenoid Operated Block Valve Valves Solenoid 1 Wiring for Single Stage Valves Solenoid 1 and Solenoid 2 Wiring for A2859 11 and 3 Way Two Stage 2848 11 Two Stage and E 7 Two Stage Disconnect the power before working...

Страница 12: ...of a meter system with a LCR 600 Liquid Control s optical air and vapor eliminators are bolted onto the strainer and wired to the LCR 600 at the factory Optical air and vapor eliminators can also be ordered separately and installed onto meter systems already in service For mechanical installation instructions refer to the manual specific to the optical air and vapor eliminator Instructions for wir...

Страница 13: ...l board PN 81944 that mounts directly to the LCR 600 CPU board Typically a P transducer operates in conjuction with a shutdown device such as a valve or a dead man The shutdown control must be wired to the LCR 600 and should draw no more than 1 A To wire P Transducer to the LCR 600 1 Unplug the J1 and J3 terminal blocks from the LCR 600 CPU board 2 Remove the screw at the top left corner of the LC...

Страница 14: ...printer or roll printer Installation is the same for both printers LCR 600 s are typically shipped with a black sheathed data cable prewired to terminals J1 and J3 on the LCR 600 CPU board To install the printer 1 Find a convenient mounting spot in the truck cab where drivers can easily operate the printer 2 Clean the mounting spot and the bottom of the printer with alcohol for the best stick 3 At...

Страница 15: ...de all of the data connections and finished installing the components connect the power to the LCR 600 and the Epson printer Before making the power connections go through the vehicle system checklist below and ensure that the electrical system of the truck meets the minimum requirements for powering the LCR 600 and the Epson printer Vehicle System Checklist Clean any corrosion from the battery te...

Страница 16: ...stalled check to make sure that it powers up correctly The LCR 600 display and the printer power light should come on when the truck s ignition is turned to the ON or to the ACC position Make sure the printer power switch is on If the LCR 600 or the printer does not power up check the wiring and the connections on the LCR 600 CPU board against the manual 4 Connect the red wire to the direct power ...

Страница 17: ... in the counter bore of the casting covered with the flat washer provided and held in place with the cotter pin provided The control switch on the front of the LCR 600 is also sealed with an O ring and held in place by a bushing secured with three socket head cap screws When replacing a control switch in the field make sure the O ring is in place on the switch shaft before reinstalling the switch ...

Страница 18: ... Screw 8 32 x Bill Of Materials Bill Of Materials Internal Components Pulser Field Install Kit 82597 09380 Nylon Washer 2 81994 PULSER 100 PPR Pulser Field Install Kit 82597 08189 Flat Washer 08201 O ring 2 Bill Of Materials 840405 CPU Board Optional Items not shown Description Part Number Lap Pad Adapter 81514 Roll Printer Extension Cable 71237 Flash Cable 81885 81324 J1 5 Pin Connector 81456 J3 ...

Страница 19: ... 2014 Liquid Controls Pub No 500393 11 14 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com ...

Отзывы: